Business Days in July 2027 for Switzerland
July 2027 has 22 working days under the Swiss federal holiday calendar. July 2027 contains no Swiss federal holidays on a weekday. The month covers 31 calendar days, of which 9 are Saturday and Sunday. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of working days in Switzerland.
working days
22
Calendar Days
31
Weekend Days
9
public holidays
0
Work Weeks
4.4
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 | 2 | 3 wknd | ||||
4 wknd | 5 | 6 | 7 | 8 | 9 | 10 wknd |
11 wknd | 12 | 13 | 14 | 15 | 16 | 17 wknd |
18 wknd | 19 | 20 | 21 | 22 | 23 | 24 wknd |
25 wknd | 26 | 27 | 28 | 29 | 30 | 31 wknd |
public holidays in July 2027
No Swiss federal holidays fall on a weekday in July 2027, so the month loses no working day to a holiday on this calendar.
Switzerland July deadlines
The MWST return for the second quarter does not fall due in July. Art. 71 Abs. 1 MWSTG gives the taxable person 60 days from the end of the reporting period to account to the ESTV, and Art. 86 Abs. 1 MWSTG the same 60 days to pay, which places a 30 June quarter-end on 29 August. Art. 35 MWSTG keeps the calendar quarter as the default Abrechnungsperiode, so a summer of thin staffing sits between the quarter-end and the deadline rather than on top of it.
Sources for these dates
- Art. 71 Abs. 1 MWSTG: Abrechnung innert 60 Tagen nach Ablauf der Abrechnungsperiode (Stand 1. Januar 2025) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 86 Abs. 1 MWSTG: Entrichtung der Steuer innert 60 Tagen nach Ablauf der Abrechnungsperiode (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 35 MWSTG: Abrechnung vierteljährlich, halbjährlich nach Saldosteuersätzen, monatlich oder jährlich nur auf Antrag (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
Checked September 9, 2026. All sources
Day-of-Week Distribution
The count of each weekday in July 2027. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 4 |
| Tuesday | 4 |
| Wednesday | 4 |
| Thursday | 5 |
| Friday | 5 |
| Saturday | 5 |
| Sunday | 4 |
Switzerland reporting cycles and business-day rules
Swiss business-day cycles run on the MWST period and on cantonal holiday law. Art. 35 MWSTG makes the calendar quarter the default Abrechnungsperiode, with half-yearly reporting under the Saldosteuersatz method and monthly or annual reporting only on application. Art. 71 Abs. 1 MWSTG then gives 60 days from the end of the period to file and Art. 86 Abs. 1 MWSTG 60 days to pay, so a quarter ending 31 March falls due on 30 May, 30 June on 29 August, 30 September on 29 November, and 31 December on 1 March, or on 29 February where the following year is a leap year. Returns are filed through the ESTV portal. Only 1 August is a federal public holiday: Art. 20a of the Arbeitsgesetz lets each canton treat up to eight further days as equivalent to a Sunday, which is why cantonal counts differ, and the Bundesamt für Justiz publishes the canton-by-canton directory of days treated as public holidays for the calculation of time limits.
Sources for these rules
- Art. 35 MWSTG: Abrechnung vierteljährlich, halbjährlich nach Saldosteuersätzen, monatlich oder jährlich nur auf Antrag (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 71 Abs. 1 MWSTG: Abrechnung innert 60 Tagen nach Ablauf der Abrechnungsperiode (Stand 1. Januar 2025) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 86 Abs. 1 MWSTG: Entrichtung der Steuer innert 60 Tagen nach Ablauf der Abrechnungsperiode (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Mehrwertsteuer online abrechnen: Einreichung über das ESTV-Portal, Dienst MWST-Abrechnung pro (Eidgenössische Steuerverwaltung ESTV)
- Der 1. August ist der einzige eidgenössische Feiertag; die Kantone dürfen höchstens acht weitere den Sonntagen gleichstellen (Art. 20a ArG) (Schweizerische Eidgenossenschaft (ch.ch))
- Verzeichnis der gesetzlichen Feiertage und der Tage, die für die Fristenberechnung wie solche behandelt werden (Art. 11 des Europäischen Übereinkommens über die Berechnung von Fristen) (Bundesamt für Justiz BJ)
Checked September 9, 2026. All sources
July 2027 working days compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows July 2027 under 11 of the site's 25 holiday calendars; the summary above gives Switzerland's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 21 | Independence Day (observed) |
| 🇬🇧United Kingdom | 22 | None |
| 🇨🇦Canada | 21 | Canada Day |
| 🇦🇺Australia | 22 | None |
| 🇮🇳India | 22 | None |
| 🇵🇭Philippines | 22 | None |
| 🇫🇷France | 21 | Fête Nationale |
| 🇩🇪Germany | 22 | None |
| 🇯🇵Japan | 21 | Marine Day |
| 🇲🇽Mexico | 22 | None |
| 🇸🇬Singapore | 22 | None |
How July 2027 compares year over year
July 2026 had 23 working days, so July 2027 has 1 fewer working day year over year. On the surrounding months, June 2027 has 22 working days and August 2027 has 22. Looking forward, July 2028 has 21 working days under the same Swiss federal holiday calendar.
Using this calculator in Switzerland
A Zurich treasury operator uses the 22-day July 2027 count to line up settlement with the MWST cycle, where Art. 71 Abs. 1 MWSTG gives 60 days from the end of the reporting period to file and Art. 86 Abs. 1 MWSTG the same 60 days to pay. A Geneva team tracking the SNB works from the quarterly monetary policy assessment dates the bank publishes in its official event schedule. A Basel controller counts working days across cantons, because Art. 20a of the Arbeitsgesetz lets each canton treat up to eight days besides 1 August as equivalent to a Sunday, so the same week can carry a different number of working days in two cantons.
Sources for these rules
- Art. 71 Abs. 1 MWSTG: Abrechnung innert 60 Tagen nach Ablauf der Abrechnungsperiode (Stand 1. Januar 2025) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 86 Abs. 1 MWSTG: Entrichtung der Steuer innert 60 Tagen nach Ablauf der Abrechnungsperiode (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Event schedule: quarterly monetary policy assessments and the Financial Stability Report publication date (Schweizerische Nationalbank SNB)
- Der 1. August ist der einzige eidgenössische Feiertag; die Kantone dürfen höchstens acht weitere den Sonntagen gleichstellen (Art. 20a ArG) (Schweizerische Eidgenossenschaft (ch.ch))
Checked September 9, 2026. All sources
How July 2027 is shaped
The headline count answers how many working days July 2027 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Swiss federal holiday calendar and a working week that treats Saturday and Sunday as the weekend, with no assumption about how any particular obligation behaves.
A 31-day month opening the second half of the year
July runs 31 days and opens both Q3 and the second half of the calendar year. It shares its weekday alignment with April, so their internal structures match and any gap between their working-day counts is a holiday effect rather than a calendar one. Of the four quarter-opening months, July is the one most likely to sit inside a period of reduced staffing, which changes what its count means in practice even though the count itself is fixed by the calendar.
In July 2027 that comes to 22 working days across 31 calendar days, against 22 in June 2027 and 22 in August 2027.
A late-week start
The month opens on the fourth working day of the week, which leaves only a short tail before the first weekend. The practical consequence is that the month's first genuinely full working week does not begin on the 1st at all. Anything scoped as "we have the first week to do this" has materially less time than the phrase suggests, and the shortfall is visible in the opening run below.
The opening stretch runs from Thursday, July 1 to July 2, two working days before the first break. July 2027 carries 22 working days in total, so that opening block is 9% of the month's working capacity.
Five working stretches
July splits into five working stretches. That is the ordinary shape of a month whose only interruptions are its weekends, and it means the month's internal boundaries are all predictable a year in advance: nothing here depends on a holiday date moving.
The working days of July 2027 arrive in stretches of 2, 5, 5, 5, and 5 days. The longest unbroken stretch runs five days, from July 5 to July 9. A task needing more consecutive working days than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is back-loaded. It opens with two consecutive days and closes with five, so the room is at the end rather than the start. That is the safer of the two imbalances, because a slip has somewhere to go, but it also makes the opening week a poor sample of the month.
Three weekdays occur five times
A 31-day month contains four full seven-day cycles and three days over, so exactly three weekdays occur five times and the other four occur four times. In July 2027 the three are Thursday, Friday, and Saturday. Which three it is follows entirely from the weekday the month opens on, which is why the working-day count of a 31-day month moves year to year even when its holidays do not.
Only Thursday and Friday among them are working days, so part of the surplus is absorbed by the Saturday and Sunday weekend and never reaches the working total. That split is why two months of the same length can carry different working-day counts without any holiday being involved.
A month with no closures, and a long one
July 2027 contains no Swiss federal holiday on any date, working or otherwise. A month with no closure loses working days only to weekends, so its count is set entirely by the weekday it opens on and its length, and here both work in the month's favour: 22 working days across 31 calendar days.
Months at this end of the range are the ones worth reserving for work that needs consecutive days rather than cumulative days. The constraint that usually breaks a long run, a closure landing mid-week, is absent, so the month's structure is entirely weekend-driven and repeats on a seven-day cycle.
A long stretch with no closure at all
July 2027 sits inside an unusually long run without a Swiss federal closure. Neither the month itself nor either edge of it carries one within a month, which means the working-day count here is set by the weekend pattern alone and will repeat exactly in any year with the same alignment.
Looking outside the month, the last was Pfingstmontag (Whit Monday) on May 17, 2027, 45 calendar days before July began and the next is Karfreitag (Good Friday) on April 14, 2028, 258 calendar days after it ends.
Across the whole of 2027 the Swiss federal calendar puts five closures on working days, of which none falls in July. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
The month ends over a weekend
July 2027 ends on a Saturday, which this calendar treats as weekend. Month-end processing cannot happen on the last calendar day, so it happens earlier and the last few dates of the month carry no settlement at all. The distance between the final working day and the final calendar day is where month-end reconciliations go missing.
The last working day of July 2027 is Friday, July 30. Counting back from there, the third-to-last is Wednesday, July 28, three calendar days before the month closes.
The working month ends on the last working day of a week, so the final stretch is a complete one and nothing is left hanging mid-week. One calendar day of July follows it with nothing settling on it.
The quarter opens here
July is the first month of Q3. An opening month sets the baseline the rest of the quarter is measured against, and it is the one month where a slip has two further months to be absorbed in. Quarterly targets divided evenly by three ignore the fact that the three months rarely carry equal working-day counts.
Across the whole quarter there are 66 working days, of which 22 fall in July. The other two months carry August 2027 with 22 and September 2027 with 22. All three months of the quarter carry the same working-day count, which happens when their weekday alignments and closures cancel out exactly.
The week's first working day is the scarcest
The first working day of the week is the one July gives least often. Anything anchored to the start of the working week (a weekly kickoff, a Monday-morning cutoff, a start-of-week batch) fires fewer times this month than the calendar count suggests, because a closure has taken one of them out.
Counted as worked rather than as occurring, July 2027 gives Monday 4, Tuesday 4, Wednesday 4, Thursday 5, and Friday 5. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
Toward the long end of the year
July sits among the longer working months of 2027 under the Swiss federal calendar. Where a month falls in that ranking is decided by two independent things, its calendar length and how many closures land on its working days, so a month can move several places between adjacent years without its length changing at all.
2027 carries 256 working days in total under the Swiss federal calendar. The longest month of the year is December 2027 with 23 and the shortest is May 2027 with 19, a spread of 4. July ranks 4th of the twelve with 22.
Switzerland closures across the year
A month's working-day count only means something against the country's whole calendar. Two countries that share a weekend and happen to have the same closure-free month can still run very different years, and Switzerland is placed as follows.
Across 2027 the Swiss federal closures fall 3 in Q1, 2 in Q2, 0 in Q3, and 0 in Q4. A further three holidays land on the Saturday and Sunday weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2027 calendar sits between January 1, 2027 and March 26, 2027, 84 calendar days with no Swiss federal closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
After the year's last closure
July 2027 falls after the last Swiss federal closure of the year, so nothing further in 2027 reduces a working-day count. Where a deadline runs from this month into the next year, the closures that can move it all belong to the following year's calendar rather than this one.
2027 opens its Swiss federal closures with Neujahrstag (New Year's Day) on January 1, 2027 and ends them with Pfingstmontag (Whit Monday) on May 17, 2027. The densest month of the year is March 2027 with two closures on working days.
One working day fewer than last year
July 2027 has one working day fewer than July 2026: 22 against 23. On a monthly target that is roughly 4% less working time for the same calendar period, which is the size of gap that shows up as an unexplained miss rather than as a known constraint.
July opens 2026 on a Wednesday, 2027 on a Thursday, and 2028 on a Saturday. That movement, one weekday in a common year and two after a leap day, is what makes the three counts differ. The number of closures on working days is the same in both years, so the whole of any difference comes from weekday alignment. Looking ahead, July 2028 carries 21 working days.
Anchor dates that do not fall on working days
Three of the common monthly anchor dates in July 2027 land on a day this calendar does not work. A month with this many blocked anchors pushes several cycles onto the same few dates, because each of them resolves forward to the next available working day and those tend to be shared.
| Date | Weekday | Status under the Swiss federal calendar | First working day on or after |
|---|---|---|---|
| July 1 | Thursday | Working day | July 1 |
| July 5 | Monday | Working day | July 5 |
| July 10 | Saturday | Weekend | July 12, 2027 |
| July 15 | Thursday | Working day | July 15 |
| July 20 | Tuesday | Working day | July 20 |
| July 25 | Sunday | Weekend | July 26, 2027 |
| July 31 | Saturday | Weekend | August 2, 2027 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in July 2027
An invoice dated the 1st of July on calendar-day Net 30 terms comes due on July 31, 2027, which is not a working day under the Swiss federal calendar. A term counted in calendar days can land anywhere in the week, and roughly two days in seven it lands somewhere nothing settles, which is the ordinary reason a payment shows as late by a day or two without anyone being late.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated July 1 | July 31, 2027 (rolls to August 2, 2027) | August 30, 2027 |
| Dated July 15 | August 14, 2027 (rolls to August 16, 2027) | September 13, 2027 |
| Dated July 31 | August 30, 2027 | September 29, 2027 |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Switzerland calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Staatssekretariat für Wirtschaft SECO (seco.admin.ch) (opens in a new tab)
Cross-checked against this source on July 23, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in July 2027 under the Swiss federal holiday calendar?
Which Switzerland holidays affect July 2027?
Why is the Swiss calendar federal only, not cantonal?
How does Switzerland handle weekend-falling holidays?
Why does the business-day count vary year to year?
When is the last working day of July 2027?
How many working days in a row does July 2027 offer?
Sources for these rules
- Der 1. August ist der einzige eidgenössische Feiertag; die Kantone dürfen höchstens acht weitere den Sonntagen gleichstellen (Art. 20a ArG) (Schweizerische Eidgenossenschaft (ch.ch))
- Gesetz über die öffentlichen Ruhetage (BR 520.100), Art. 2: die Feiertage Neujahr, Karfreitag, Ostermontag, Auffahrt, Pfingstmontag, Weihnachtstag und Stefanstag; Art. 3: die Gemeindebehörden können weitere konfessionelle Feiertage als lokale Ruhetage bezeichnen (Kanton Graubünden (Bündner Rechtsbuch))
- Zürich: kantonsweite Feiertage nach dem Recht des Kantons (zh.ch)
- Bern: kantonsweite Feiertage nach dem Recht des Kantons (belex.sites.be.ch)
- Vaud: kantonsweite Feiertage nach dem Recht des Kantons (prestations.vd.ch)
- Genève: kantonsweite Feiertage nach dem Recht des Kantons (ge.ch)
- St. Gallen: kantonsweite Feiertage nach dem Recht des Kantons (gesetzessammlung.sg.ch)
- Luzern: kantonsweite Feiertage nach dem Recht des Kantons (srl.lu.ch)
- Ticino: kantonsweite Feiertage nach dem Recht des Kantons (m3.ti.ch)
- Uri: kantonsweite Feiertage nach dem Recht des Kantons (rechtsbuch.ur.ch)
- Schwyz: kantonsweite Feiertage nach dem Recht des Kantons (sz.ch)
- Obwalden: kantonsweite Feiertage nach dem Recht des Kantons (gdb.ow.ch)
- Nidwalden: kantonsweite Feiertage nach dem Recht des Kantons (gesetze.nw.ch)
- Glarus: kantonsweite Feiertage nach dem Recht des Kantons (gesetze.gl.ch)
- Zug: kantonsweite Feiertage nach dem Recht des Kantons (bgs.zg.ch)
- Basel-Stadt: kantonsweite Feiertage nach dem Recht des Kantons (gesetzessammlung.bs.ch)
- Basel-Landschaft: kantonsweite Feiertage nach dem Recht des Kantons (bl.clex.ch)
- Schaffhausen: kantonsweite Feiertage nach dem Recht des Kantons (rechtsbuch.sh.ch)
- Appenzell Innerrhoden: kantonsweite Feiertage nach dem Recht des Kantons (ai.clex.ch)
- Thurgau: kantonsweite Feiertage nach dem Recht des Kantons (rechtsbuch.tg.ch)
- Valais: kantonsweite Feiertage nach dem Recht des Kantons (lex.vs.ch)
- Neuchâtel: kantonsweite Feiertage nach dem Recht des Kantons (ne.ch)
- Jura: kantonsweite Feiertage nach dem Recht des Kantons (jura.ch)
- Fribourg: kantonsweite Feiertage nach dem Recht des Kantons (bdlf.fr.ch)
- Solothurn: kantonsweite Feiertage nach dem Recht des Kantons (bgs.so.ch)
- Aargau: kantonsweite Feiertage nach dem Recht des Kantons (gesetzessammlungen.ag.ch)
- Appenzell Ausserrhoden: kantonsweite Feiertage nach dem Recht des Kantons (ar.clex.ch)
- Verordnung zum Arbeitsgesetz (bGS 822.11), Art. 7: der zweite Weihnachtstag wird nicht gefeiert, wenn der 1. Weihnachtstag auf einen Montag oder Freitag fällt (Kanton Appenzell Ausserrhoden (Gesetzessammlung))
- Art. 78 OR: fällt der Erfüllungstag oder der letzte Tag einer Frist auf einen Sonntag oder einen am Erfüllungsorte staatlich anerkannten Feiertag, gilt der nächstfolgende Werktag; Fussnote 40: für Fristen des Bundesrechts ist der Samstag einem anerkannten Feiertag gleichgestellt (SR 173.110.3) (Stand 1. Januar 2026) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
Checked October 8, 2026. All sources