July 2027 has 22 días laborables under the Spain-wide holiday calendar. July 2027 contains no Spain-wide holidays on a weekday. The month covers 31 calendar days, of which 9 are sábado and domingo. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of días laborables in Spain.
días laborables
22
Calendar Days
31
Weekend Days
9
días festivos
0
Work Weeks
4.4
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 | 2 | 3 wknd | ||||
4 wknd | 5 | 6 | 7 | 8 | 9 | 10 wknd |
11 wknd | 12 | 13 | 14 | 15 | 16 | 17 wknd |
18 wknd | 19 | 20 | 21 | 22 | 23 | 24 wknd |
25 wknd | 26 | 27 | 28 | 29 | 30 | 31 wknd |
días festivos in July 2027
No Spain-wide holidays fall on a weekday in July 2027, so the month loses no working day to a holiday on this calendar.
Spain July deadlines
July is the heaviest month in the Spanish corporate calendar. Modelo 303 and Modelo 130 for Q2 both close in the first twenty calendar days. Modelo 200, the Impuesto sobre Sociedades return, follows a period rather than a date: Article 124.1 of the Ley 27/2014 gives 25 calendar days after the six months following the end of the tax year, which for a calendar-year entity falls in the last week of July and moves to the next business day when it lands on a weekend.
Sources for these dates
- Art. 71.4 del Reglamento del IVA (Real Decreto 1624/1992): veinte primeros días naturales tras el trimestre, treinta primeros días de enero para el último período del año, treinta para los declarantes mensuales (Boletín Oficial del Estado)
- Art. 111.1 del Reglamento del IRPF (Real Decreto 439/2007): pagos fraccionados entre el día 1 y el 20 de abril, julio y octubre, y el cuarto trimestre entre el 1 y el 30 de enero (Boletín Oficial del Estado)
- Plazo de presentación del modelo 303: del 1 al 20 del mes siguiente; el cuarto trimestre del 1 al 30 de enero; el sábado es día inhábil (Agencia Estatal de Administración Tributaria)
- Art. 124.1 de la Ley 27/2014 del Impuesto sobre Sociedades: la declaración se presenta en los 25 días naturales siguientes a los 6 meses posteriores a la conclusión del período impositivo (Boletín Oficial del Estado)
- Vencimientos en días inhábiles, sábados y festivos: si el vencimiento coincide con una festividad local o autonómica, el plazo finaliza el primer día hábil siguiente (Agencia Estatal de Administración Tributaria)
Checked September 10, 2026. All sources
Day-of-Week Distribution
The count of each weekday in July 2027. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 4 |
| Tuesday | 4 |
| Wednesday | 4 |
| Thursday | 5 |
| Friday | 5 |
| Saturday | 5 |
| Sunday | 4 |
Spain reporting cycles and business-day rules
Each provision cited here sets a filing window, not a single date. Article 71.4 of the Reglamento del IVA puts the quarterly VAT return (Modelo 303) in the first twenty días naturales (calendar days) of the month after the quarter, the return for the last period of the year in the first thirty of January, and a monthly return in the first thirty of the following month, or by the last day of February for January. Article 111.1 of the Reglamento del IRPF puts the pagos fraccionados (Modelos 130 and 131) between the 1st and the 20th of April, July and October, and the fourth quarter's between the 1st and the 30th of January. Under Article 108.1, withholdings (Modelo 111 among the returns) are declared in the first twenty días naturales of April, July, October and January, and in the first twenty of every month where numbers 1 and 2 of Article 71.3 of the Reglamento del IVA apply or where, for the income the article names, the withholder is a public administration whose last approved annual budget exceeds 6 million euros. Article 124.1 of Ley 27/2014 puts the Impuesto sobre Sociedades return (Modelo 200) in the 25 días naturales that follow the six months after the end of the tax period. The AEAT's 2026 taxpayer calendar says that a deadline which falls on a local or regional holiday ends on the next día hábil, except Modelo 369; the AEAT page on the Modelo 303 filing period adds that Saturday is inhábil and that a last filing day which is inhábil moves to the next día hábil.
Sources for these rules
- Reglamento del IVA (Real Decreto 1624/1992), art. 71.3 and 71.4, consolidated text as read on 2026-10-13: the return is filed in the first twenty días naturales of the month after the quarterly period; the return for the last period of the year in the first thirty días naturales of January; those whose period is the calendar month (art. 62.6, first paragraph) file in the first thirty días naturales of the following month, or by the last day of February for January. Art. 71.3 makes the period monthly for, among others, those whose volume of operations exceeded 6,010,121.04 euros in the preceding calendar year (number 1) and the acquirers of a business above the same sum (number 2) (Boletín Oficial del Estado)
- Plazo de presentación del modelo 303, as read on 2026-10-13: quarterly returns from the 1st to the 20th of the month after the period and the fourth quarter from 1 to 30 January; monthly returns from the 1st to the 30th of the following month, or to the last day of February for January; when the last filing day is inhábil (Saturday is inhábil) the deadline moves to the next día hábil (Agencia Estatal de Administración Tributaria)
- Reglamento del IRPF (Real Decreto 439/2007), art. 111.1, consolidated text as read on 2026-10-13: pagos fraccionados are declared and paid between the 1st and the 20th of April, July and October for the first three quarters and between the 1st and the 30th of January for the fourth (Boletín Oficial del Estado)
- Reglamento del IRPF (Real Decreto 439/2007), art. 108.1, consolidated text as read on 2026-10-13: withholdings are declared and paid in the first twenty días naturales of April, July, October and January for the preceding calendar quarter; in the first twenty días naturales of each month for the preceding month by those within numbers 1 and 2 of art. 71.3 of the Reglamento del IVA and, for the income of art. 75.1 a) and c) and 75.2 c), by public administrations whose last approved annual budget exceeds 6 million euros (Boletín Oficial del Estado)
- Calendario del contribuyente 2026, Hasta el 20 de octubre: the models due that day by obligation, among them withholdings (111 and others, quarterly and, for grandes empresas, monthly), pagos fraccionados of the IRPF (130 in estimación directa, 131 in estimación objetiva) and the IVA return (303) (Agencia Estatal de Administración Tributaria)
- Ley 27/2014 del Impuesto sobre Sociedades, art. 124.1, consolidated text as read on 2026-10-13: the return is filed within the 25 días naturales that follow the six months after the end of the tax period (período impositivo) (Boletín Oficial del Estado)
- Calendario del contribuyente 2026, Hasta el 27 de julio: annual Impuesto sobre Sociedades return for 2025, models 200, 206 and 220, for entities whose tax period is the calendar year; other entities within the 25 días naturales that follow the six months after the end of the tax period (Agencia Estatal de Administración Tributaria)
- Calendario del contribuyente 2026, Vencimientos en días inhábiles, sábados y festivos: si el vencimiento coincide con una festividad local o autonómica, el plazo finaliza el primer día hábil siguiente al señalado en el calendario, excepto para el modelo 369 (Agencia Estatal de Administración Tributaria)
Checked October 13, 2026. All sources
July 2027 días laborables compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows July 2027 under 11 of the site's 25 holiday calendars; the summary above gives Spain's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 21 | Independence Day (observed) |
| 🇬🇧United Kingdom | 22 | None |
| 🇨🇦Canada | 21 | Canada Day |
| 🇦🇺Australia | 22 | None |
| 🇮🇳India | 22 | None |
| 🇵🇭Philippines | 22 | None |
| 🇫🇷France | 21 | Fête Nationale |
| 🇩🇪Germany | 22 | None |
| 🇯🇵Japan | 21 | Marine Day |
| 🇲🇽Mexico | 22 | None |
| 🇸🇬Singapore | 22 | None |
How July 2027 compares year over year
July 2026 had 23 días laborables, so July 2027 has 1 fewer working day year over year. On the surrounding months, June 2027 has 22 días laborables and August 2027 has 22. Looking forward, July 2028 has 21 días laborables under the same Spain-wide holiday calendar.
Using this calculator in Spain
The 22 business days of July 2027 are its Monday-to-Friday days less the days of the calculator's Spain set, the days that are a holiday in all seventeen comunidades autónomas, in Ceuta and in Melilla; a holiday missing from any of those territories is not in the set. The count measures the days the month offers for preparing a return, not where a filing window ends: Article 124.1 of Ley 27/2014, for one, sets the window for the Impuesto sobre Sociedades return (Modelo 200) in días naturales (calendar days), the 25 that follow the six months after the end of the tax period. A window's end can also move: the AEAT's 2026 taxpayer calendar says that a deadline which falls on a local or regional holiday ends on the next día hábil, except Modelo 369, whose filing period does not move.
Sources for these rules
- Resolución de 23 de octubre de 2023 por la que se publica la relación de fiestas laborales para el año 2024 (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Resolución de 15 de octubre de 2024 por la que se publica la relación de fiestas laborales para el año 2025 (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Resolución de 17 de octubre de 2025 por la que se publica la relación de fiestas laborales para el año 2026: doce fiestas nacionales y autonómicas más hasta dos fiestas locales por municipio (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Resolución de 8 de octubre de 2026 por la que se publica relación de fiestas laborales para el año 2027 (BOE of 13 October 2026) (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Ley 27/2014 del Impuesto sobre Sociedades, art. 124.1, consolidated text as read on 2026-10-13: the return is filed within the 25 días naturales that follow the six months after the end of the tax period (período impositivo) (Boletín Oficial del Estado)
- Calendario del contribuyente 2026, Hasta el 27 de julio: annual Impuesto sobre Sociedades return for 2025, models 200, 206 and 220, for entities whose tax period is the calendar year; other entities within the 25 días naturales that follow the six months after the end of the tax period (Agencia Estatal de Administración Tributaria)
- Calendario del contribuyente 2026, Vencimientos en días inhábiles, sábados y festivos: si el vencimiento coincide con una festividad local o autonómica, el plazo finaliza el primer día hábil siguiente al señalado en el calendario, excepto para el modelo 369 (Agencia Estatal de Administración Tributaria)
Checked October 13, 2026. All sources
How July 2027 is shaped
The headline count answers how many días laborables July 2027 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Spain-wide holiday calendar and a working week that treats sábado and domingo as the weekend, with no assumption about how any particular obligation behaves.
A 31-day month opening the second half of the year
July runs 31 days and opens both Q3 and the second half of the calendar year. It shares its weekday alignment with April, so their internal structures match and any gap between their working-day counts is a holiday effect rather than a calendar one. Of the four quarter-opening months, July is the one most likely to sit inside a period of reduced staffing, which changes what its count means in practice even though the count itself is fixed by the calendar.
In July 2027 that comes to 22 días laborables across 31 calendar days, against 22 in June 2027 and 22 in August 2027.
A late-week start
The month opens on the fourth working day of the week, which leaves only a short tail before the first weekend. The practical consequence is that the month's first genuinely full working week does not begin on the 1st at all. Anything scoped as "we have the first week to do this" has materially less time than the phrase suggests, and the shortfall is visible in the opening run below.
The opening stretch runs from Thursday, July 1 to July 2, two días laborables before the first break. July 2027 carries 22 días laborables in total, so that opening block is 9% of the month's working capacity.
Five working stretches
July splits into five working stretches. That is the ordinary shape of a month whose only interruptions are its weekends, and it means the month's internal boundaries are all predictable a year in advance: nothing here depends on a holiday date moving.
The working days of July 2027 arrive in stretches of 2, 5, 5, 5, and 5 days. The longest unbroken stretch runs five days, from July 5 to July 9. A task needing more consecutive días laborables than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is back-loaded. It opens with two consecutive days and closes with five, so the room is at the end rather than the start. That is the safer of the two imbalances, because a slip has somewhere to go, but it also makes the opening week a poor sample of the month.
Three weekdays occur five times
A 31-day month contains four full seven-day cycles and three days over, so exactly three weekdays occur five times and the other four occur four times. In July 2027 the three are Thursday, Friday, and Saturday. Which three it is follows entirely from the weekday the month opens on, which is why the working-day count of a 31-day month moves year to year even when its holidays do not.
Only Thursday and Friday among them are working days, so part of the surplus is absorbed by the sábado and domingo weekend and never reaches the working total. That split is why two months of the same length can carry different working-day counts without any holiday being involved.
A month with no closures, and a long one
July 2027 contains no Spain-wide holiday on any date, working or otherwise. A month with no closure loses working days only to weekends, so its count is set entirely by the weekday it opens on and its length, and here both work in the month's favour: 22 días laborables across 31 calendar days.
Months at this end of the range are the ones worth reserving for work that needs consecutive days rather than cumulative days. The constraint that usually breaks a long run, a closure landing mid-week, is absent, so the month's structure is entirely weekend-driven and repeats on a seven-day cycle.
A long stretch with no closure at all
July 2027 sits inside an unusually long run without a Spain-wide closure. Neither the month itself nor either edge of it carries one within a month, which means the working-day count here is set by the weekend pattern alone and will repeat exactly in any year with the same alignment.
Looking outside the month, the last was Viernes Santo on March 26, 2027, 97 calendar days before July began and the next is Fiesta Nacional de España on October 12, 2027, 73 calendar days after it ends.
Across the whole of 2027 the Spain-wide calendar puts seven closures on working days, of which none falls in July. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
The month ends over a weekend
July 2027 ends on a Saturday, which this calendar treats as weekend. Month-end processing cannot happen on the last calendar day, so it happens earlier and the last few dates of the month carry no settlement at all. The distance between the final working day and the final calendar day is where month-end reconciliations go missing.
The last working day of July 2027 is Friday, July 30. Counting back from there, the third-to-last is Wednesday, July 28, three calendar days before the month closes.
The working month ends on the last working day of a week, so the final stretch is a complete one and nothing is left hanging mid-week. One calendar day of July follows it with nothing settling on it.
The quarter opens here
July is the first month of Q3. An opening month sets the baseline the rest of the quarter is measured against, and it is the one month where a slip has two further months to be absorbed in. Quarterly targets divided evenly by three ignore the fact that the three months rarely carry equal working-day counts.
Across the whole quarter there are 66 días laborables, of which 22 fall in July. The other two months carry August 2027 with 22 and September 2027 with 22. All three months of the quarter carry the same working-day count, which happens when their weekday alignments and closures cancel out exactly.
The week's first working day is the scarcest
The first working day of the week is the one July gives least often. Anything anchored to the start of the working week (a weekly kickoff, a Monday-morning cutoff, a start-of-week batch) fires fewer times this month than the calendar count suggests, because a closure has taken one of them out.
Counted as worked rather than as occurring, July 2027 gives Monday 4, Tuesday 4, Wednesday 4, Thursday 5, and Friday 5. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
Toward the long end of the year
July sits among the longer working months of 2027 under the Spain-wide calendar. Where a month falls in that ranking is decided by two independent things, its calendar length and how many closures land on its working days, so a month can move several places between adjacent years without its length changing at all.
2027 carries 254 días laborables in total under the Spain-wide calendar. The longest month of the year is March 2027 with 22 and the shortest is January 2027 with 19, a spread of 3. July ranks 4th of the twelve with 22.
Inside the year's longest clear run
July 2027 sits inside the longest stretch of 2027 with no Spain-wide closure in it. Where a month falls relative to its country's closure clusters changes what the same working-day count is worth: an uninterrupted month inside a long clear run behaves differently from one of equal length wedged between two closures.
Across 2027 the Spain-wide closures fall 3 in Q1, 0 in Q2, 0 in Q3, and 4 in Q4. A further three holidays land on the sábado and domingo weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2027 calendar sits between March 26, 2027 and October 12, 2027, 200 calendar days with no Spain-wide closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
Where the month sits in the year's closure pattern
Closures are not spread evenly across a calendar year. They cluster around fixed anniversaries and around whichever lunar or movable feasts a jurisdiction observes, so two adjacent months can carry very different loads, and the Spain-wide calendar is no exception.
2027 opens its Spain-wide closures with Año Nuevo on January 1, 2027 and ends them with Inmaculada Concepción on December 8, 2027. The densest month of the year is January 2027 with two closures on working days.
One working day fewer than last year
July 2027 has one días laborable fewer than July 2026: 22 against 23. On a monthly target that is roughly 4% less working time for the same calendar period, which is the size of gap that shows up as an unexplained miss rather than as a known constraint.
July opens 2026 on a Wednesday, 2027 on a Thursday, and 2028 on a Saturday. That movement, one weekday in a common year and two after a leap day, is what makes the three counts differ. The number of closures on working days is the same in both years, so the whole of any difference comes from weekday alignment. Looking ahead, July 2028 carries 21 días laborables.
Anchor dates that do not fall on working days
Three of the common monthly anchor dates in July 2027 land on a day this calendar does not work. A month with this many blocked anchors pushes several cycles onto the same few dates, because each of them resolves forward to the next available working day and those tend to be shared.
| Date | Weekday | Status under the Spain-wide calendar | First working day on or after |
|---|---|---|---|
| July 1 | Thursday | Working day | July 1 |
| July 5 | Monday | Working day | July 5 |
| July 10 | Saturday | Weekend | July 12, 2027 |
| July 15 | Thursday | Working day | July 15 |
| July 20 | Tuesday | Working day | July 20 |
| July 25 | Sunday | Weekend | July 26, 2027 |
| July 31 | Saturday | Weekend | August 2, 2027 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in July 2027
An invoice dated the 1st of July on calendar-day Net 30 terms comes due on July 31, 2027, which is not a working day under the Spain-wide calendar. A term counted in calendar days can land anywhere in the week, and roughly two days in seven it lands somewhere nothing settles, which is the ordinary reason a payment shows as late by a day or two without anyone being late.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated July 1 | July 31, 2027 (rolls to August 2, 2027) | August 30, 2027 |
| Dated July 15 | August 14, 2027 (rolls to August 16, 2027) | September 13, 2027 |
| Dated July 31 | August 30, 2027 | September 29, 2027 |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Spain calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Boletín Oficial del Estado (boe.es) (opens in a new tab)
Cross-checked against this source on October 13, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in July 2027 under the Spain-wide holiday calendar?
Which Spain holidays affect July 2027?
Why does the Spanish calendar vary year-to-year?
What happens when a Spanish national holiday falls on a Sunday?
Why does the business-day count vary year to year?
When is the last working day of July 2027?
How many working days in a row does July 2027 offer?
Sources for these rules
- Estatuto de los Trabajadores (Real Decreto Legislativo 2/2015), art. 37.2, consolidated text as read on 2026-10-13: fiestas laborales may not exceed fourteen a year, two of them local; the Natividad del Señor, Año Nuevo, 1 May and 12 October are respected as national holidays in any case; the rest day of a holiday that coincides with a Sunday is moved in every case to the Monday immediately after; the comunidades autónomas, within the limit of fourteen, may put their traditional holidays in place of the national ones the regulations determine and, in every case, of those moved to a Monday; a community that cannot set one of its traditional holidays because too few national holidays coincide with a Sunday may, that year, add one more, recoverable, to the maximum of fourteen (Boletín Oficial del Estado)
- Real Decreto 2001/1983, arts. 45 and 46 (art. 45 as worded by Real Decreto 1346/1989): 45.1 the national holidays, letters a) to c) nine days (12 October, 6 December, 1 January, 1 May, 25 December, 15 August, 1 November, 8 December, Viernes Santo) and letter d) Jueves Santo, 6 January and 19 March or 25 July; 45.2 when one of them coincides with a Sunday its rest day is taken on the Monday immediately after; 45.3 the comunidades autónomas may replace the letter d) holidays, and the Monday rest of national holidays that coincide with a Sunday, with holidays traditional to them; 45.4 they send their lists to the ministry each year before 30 September for publication in the BOE, unless the list was adopted as permanent; 46 up to two days a year are local holidays in each municipality (Boletín Oficial del Estado)
- Resolución de 23 de octubre de 2023 por la que se publica la relación de fiestas laborales para el año 2024 (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Resolución de 15 de octubre de 2024 por la que se publica la relación de fiestas laborales para el año 2025 (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Resolución de 17 de octubre de 2025 por la que se publica la relación de fiestas laborales para el año 2026: doce fiestas nacionales y autonómicas más hasta dos fiestas locales por municipio (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
- Resolución de 8 de octubre de 2026 por la que se publica relación de fiestas laborales para el año 2027 (BOE of 13 October 2026) (Dirección General de Trabajo, Ministerio de Trabajo y Economía Social)
Checked October 13, 2026. All sources