Business Days in January 2027 for Italy
January 2027 has 19 giorni lavorativi under the Italian national holiday calendar. January 2027 contains 2 Italian national holidays on weekdays. The month covers 31 calendar days, of which 10 are sabato and domenica. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of giorni lavorativi in Italy.
giorni lavorativi
19
Calendar Days
31
Weekend Days
10
festività nazionali
2
Work Weeks
3.8
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 Capodanno | 2 wknd | |||||
3 wknd | 4 | 5 | 6 Epifania | 7 | 8 | 9 wknd |
10 wknd | 11 | 12 | 13 | 14 | 15 | 16 wknd |
17 wknd | 18 | 19 | 20 | 21 | 22 | 23 wknd |
24 wknd | 25 | 26 | 27 | 28 | 29 | 30 wknd |
31 wknd |
festività nazionali in January 2027
Italy January deadlines
Capodanno on 1 January and Epifania on 6 January are both giorni festivi under Legge 260/1949. The F24 carrying December withholding falls due on the 16th, and where the 16th is a Saturday or a holiday the payment is timely on the first following working day. The December liquidazione IVA mensile is settled by the 16th of the following month, which puts it here alongside the withholding.
Sources for these dates
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 1 del D.P.R. 23 marzo 1998, n. 100: entro il giorno 16 di ciascun mese il contribuente liquida e versa l'IVA del mese precedente, e il versamento relativo al mese di dicembre è effettuato entro il giorno 16 del mese successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 8, 2026. All sources
Day-of-Week Distribution
The count of each weekday in January 2027. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 4 |
| Tuesday | 4 |
| Wednesday | 4 |
| Thursday | 4 |
| Friday | 5 |
| Saturday | 5 |
| Sunday | 5 |
Italy reporting cycles and business-day rules
Italian business-day cycles run on the F24, which carries withholding and the monthly liquidazione IVA and falls due on the 16th of the following month; where the 16th is a Saturday or a holiday, payment is timely on the first working day after it. Anything falling due between 1 and 20 August may be settled by 20 August with no surcharge, which is a standing rule and not an annual concession. Filing and payment are separate obligations and the dates differ: the Modello Redditi is filed telematically between 15 April and 31 October, for individuals and for companies whose tax period ends in December, while the balance and the first advance instalment fall due on 30 June, or thirty days later with a 0.40 per cent uplift, and the second advance instalment falls in November. The Certificazione Unica goes to the people it covers by 16 March. Euro wholesale settlement runs on T2, which TARGET2 became in March 2023, and Banca d'Italia continues to operate BI-Comp for retail clearing.
Sources for these rules
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 1 del D.P.R. 23 marzo 1998, n. 100: entro il giorno 16 di ciascun mese il contribuente liquida e versa l'IVA del mese precedente, e il versamento relativo al mese di dicembre è effettuato entro il giorno 16 del mese successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 11 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: gli adempimenti fiscali e i versamenti che hanno scadenza dal 1° al 20 agosto di ogni anno possono essere effettuati entro il giorno 20 dello stesso mese, senza alcuna maggiorazione (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 17 del D.P.R. 7 dicembre 2001, n. 435: il saldo delle persone fisiche è versato entro il 30 giugno e quello IRES entro l'ultimo giorno del sesto mese successivo alla chiusura, con facoltà di versare entro il trentesimo giorno successivo maggiorando dello 0,40 per cento; l'acconto è dovuto in due rate, la prima al termine del saldo e la seconda nel mese di novembre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
Checked October 7, 2026. All sources
January 2027 giorni lavorativi compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows January 2027 under 11 of the site's 25 holiday calendars; the summary above gives Italy's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 19 | New Year's Day, Martin Luther King Jr. Day |
| 🇬🇧United Kingdom | 20 | New Year's Day |
| 🇨🇦Canada | 20 | New Year's Day |
| 🇦🇺Australia | 19 | New Year's Day, Australia Day |
| 🇮🇳India | 20 | Republic Day |
| 🇵🇭Philippines | 20 | New Year's Day |
| 🇫🇷France | 20 | Jour de l'An |
| 🇩🇪Germany | 20 | Neujahrstag |
| 🇯🇵Japan | 19 | New Year's Day, Coming of Age Day |
| 🇲🇽Mexico | 20 | Año Nuevo |
| 🇸🇬Singapore | 20 | New Year's Day |
How January 2027 compares year over year
January 2026 had 20 giorni lavorativi, so January 2027 has 1 fewer working day year over year. On the surrounding months, December 2026 has 21 giorni lavorativi and February 2027 has 20. Looking forward, January 2028 has 20 giorni lavorativi under the same Italian national holiday calendar.
Using this calculator in Italy
A Milan corporate controller uses the 19-day January 2027 count to line T2 settlement up with the F24 deadline on the 16th, and to see where that 16th rolls onto the first following working day. A Rome law firm counts giorni lavorativi against D.Lgs. 231/2002, which caps commercial payment at 30 days unless a longer period is expressly agreed and provable in writing, and against INPS contribution cycles: ENPALS was suppressed in 2012 and its functions passed to INPS. A Florence manufacturing controller uses the count to separate the Certificazione Unica, delivered to employees by 16 March, from the Modello Redditi filing window that closes on 31 October.
Sources for these rules
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4 del D.Lgs. 9 ottobre 2002, n. 231: il periodo di pagamento non può superare trenta giorni, i termini superiori a sessanta giorni devono essere pattuiti espressamente e provati per iscritto, e verso una pubblica amministrazione non possono comunque superare sessanta giorni (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 21 del D.L. 6 dicembre 2011, n. 201: l'INPDAP e l'ENPALS sono soppressi dal 1 gennaio 2012 e le relative funzioni sono attribuite all'INPS (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 7, 2026. All sources
How January 2027 is shaped
The headline count answers how many giorni lavorativi January 2027 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Italian national holiday calendar and a working week that treats sabato and domenica as the weekend, with no assumption about how any particular obligation behaves.
The month that opens the year and the quarter together
January is one of only four months that begins a quarter, and the only one that begins a calendar year at the same time. Its 31 days are the joint longest, and its first day is the single date on which the largest number of annual cycles reset at once. That concentration is the reason a January working-day count is worth checking rather than assuming: every cycle that starts here inherits whatever the month's alignment gives it.
In January 2027 that comes to 19 giorni lavorativi across 31 calendar days, against 21 in December 2026 and 20 in February 2027.
The month opens on a closure
January 2027 begins on a public holiday. Capodanno falls on the 1st, which is a Friday this year, so the calendar month and the working month start on different dates. Any obligation written as "the first of the month" and any obligation written as "the first giorni lavorativi" point at different days in January 2027, and a schedule that treats them as interchangeable is wrong by at least one day here.
The month's first working day is Monday, January 4, and January 2027 carries 19 giorni lavorativi in total.
Five working stretches
January splits into five working stretches. That is the ordinary shape of a month whose only interruptions are its weekends, and it means the month's internal boundaries are all predictable a year in advance: nothing here depends on a holiday date moving.
The working days of January 2027 arrive in stretches of 2, 2, 5, 5, and 5 days. The longest unbroken stretch runs five days, from January 11 to January 15. A task needing more consecutive giorni lavorativi than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is back-loaded. It opens with two consecutive days and closes with five, so the room is at the end rather than the start. That is the safer of the two imbalances, because a slip has somewhere to go, but it also makes the opening week a poor sample of the month.
Three weekdays occur five times
A 31-day month contains four full seven-day cycles and three days over, so exactly three weekdays occur five times and the other four occur four times. In January 2027 the three are Sunday, Friday, and Saturday. Which three it is follows entirely from the weekday the month opens on, which is why the working-day count of a 31-day month moves year to year even when its holidays do not.
Only Friday among them is a working day, so part of the surplus is absorbed by the sabato and domenica weekend and never reaches the working total. That split is why two months of the same length can carry different working-day counts without any holiday being involved.
Two closures in the month
Two Italian national holidays fall on working days in January 2027: Capodanno on Friday, January 1 and Epifania on Wednesday, January 6. Two closures remove two days from the total, but their effect on the month's usable structure depends on how far apart they are.
They sit 5 calendar days apart, which puts them in different working weeks. Two closures in separate weeks cost the same total as two in one week and do less damage to any single stretch, so the month's longest run survives better than the count alone suggests.
The closure arrives before any working day has passed, so January is interrupted before it has started and the whole of its 19 remaining giorni lavorativi sit after the break.
The closures around this month
January 2027 carries two Italian national closures of its own, and the months on either side add their own. Where a deadline sits close to a month boundary, the closure that moves it is as likely to be outside the month as inside it.
Looking outside the month, the last was Natale on December 25, 2026, 7 calendar days before January began and the next is Lunedì dell'Angelo on March 29, 2027, 57 calendar days after it ends.
Across the whole of 2027 the Italian national calendar puts seven closures on working days, of which two fall in January. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
The month ends over a weekend
January 2027 ends on a Sunday, which this calendar treats as weekend. Month-end processing cannot happen on the last calendar day, so it happens earlier and the last few dates of the month carry no settlement at all. The distance between the final working day and the final calendar day is where month-end reconciliations go missing.
The last working day of January 2027 is Friday, January 29. Counting back from there, the third-to-last is Wednesday, January 27, four calendar days before the month closes.
The working month ends on the last working day of a week, so the final stretch is a complete one and nothing is left hanging mid-week. Two calendar days of January follow it with nothing settling on them.
The quarter opens here
January is the first month of Q1. An opening month sets the baseline the rest of the quarter is measured against, and it is the one month where a slip has two further months to be absorbed in. Quarterly targets divided evenly by three ignore the fact that the three months rarely carry equal working-day counts.
Across the whole quarter there are 61 giorni lavorativi, of which 19 fall in January. The other two months carry February 2027 with 20 and March 2027 with 22. It is the smallest of the three, so the quarter's capacity sits mostly in the other two months and a plan that spreads work evenly across the quarter will over-commit January.
The middle of the working week is the scarcest
The third working day of the week is the one January gives least often. Mid-week scarcity is the easiest kind to absorb, because work pinned to the middle of a week can usually move a day in either direction without crossing a weekend.
Counted as worked rather than as occurring, January 2027 gives Monday 4, Tuesday 4, Wednesday 3, Thursday 4, and Friday 4. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
One of the year's shortest working months
No month of 2027 carries fewer giorni lavorativi than January under the Italian national calendar. Two forces set a month's position in that ranking, its length and its closures, and they can either compound or cancel: a long month with several closures and a short month with none can land on the same count.
2027 carries 254 giorni lavorativi in total under the Italian national calendar. The longest month of the year is March 2027 with 22 and the shortest is January 2027 with 19, a spread of 3. January ranks 12th of the twelve with 19.
Inside one of the year's denser months
January 2027 carries more than one Italian national closure, which puts it among the year's denser months. Closures are never spread evenly across a year, so a month's own count says as much about the country's calendar as about the month.
Across 2027 the Italian national closures fall 3 in Q1, 1 in Q2, 0 in Q3, and 3 in Q4. A further five holidays land on the sabato and domenica weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2027 calendar sits between June 2, 2027 and October 4, 2027, 124 calendar days with no Italian national closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
Where the month sits in the year's closure pattern
Closures are not spread evenly across a calendar year. They cluster around fixed anniversaries and around whichever lunar or movable feasts a jurisdiction observes, so two adjacent months can carry very different loads, and the Italian national calendar is no exception.
2027 opens its Italian national closures with Capodanno on January 1, 2027 and ends them with Immacolata Concezione on December 8, 2027. The densest month of the year is January 2027 with two closures on working days.
One working day fewer than last year
January 2027 has one giorni lavorativi fewer than January 2026: 19 against 20. On a monthly target that is roughly 5% less working time for the same calendar period, which is the size of gap that shows up as an unexplained miss rather than as a known constraint.
January opens 2026 on a Thursday, 2027 on a Friday, and 2028 on a Saturday. That movement, one weekday in a common year and two after a leap day, is what makes the three counts differ. The number of closures on working days is the same in both years, so the whole of any difference comes from weekday alignment. Looking ahead, January 2028 carries 20 giorni lavorativi.
Anchor dates that do not fall on working days
Three of the common monthly anchor dates in January 2027 land on a day this calendar does not work. A month with this many blocked anchors pushes several cycles onto the same few dates, because each of them resolves forward to the next available working day and those tend to be shared.
| Date | Weekday | Status under the Italian national calendar | First working day on or after |
|---|---|---|---|
| January 1 | Friday | Closed: Capodanno | January 4, 2027 |
| January 5 | Tuesday | Working day | January 5 |
| January 10 | Sunday | Weekend | January 11, 2027 |
| January 15 | Friday | Working day | January 15 |
| January 20 | Wednesday | Working day | January 20 |
| January 25 | Monday | Working day | January 25 |
| January 31 | Sunday | Weekend | February 1, 2027 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in January 2027
An invoice dated the 1st of January on calendar-day Net 30 terms comes due on January 31, 2027, which is not a working day under the Italian national calendar. A term counted in calendar days can land anywhere in the week, and roughly two days in seven it lands somewhere nothing settles, which is the ordinary reason a payment shows as late by a day or two without anyone being late.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated January 1 | January 31, 2027 (rolls to February 1, 2027) | March 2, 2027 |
| Dated January 15 | February 14, 2027 (rolls to February 15, 2027) | March 16, 2027 |
| Dated January 31 | March 2, 2027 | April 1, 2027 |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Italy calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Normattiva (normattiva.it) (opens in a new tab)
Cross-checked against this source on September 10, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in January 2027 under the Italian national holiday calendar?
Which Italy holidays affect January 2027?
Is Santo Stefano (December 26) observed as a national holiday in Italy?
How does the Festa del Patrono affect this national calendar?
Why does the business-day count vary year to year?
When is the last working day of January 2027?
How many working days in a row does January 2027 offer?
Sources for these rules
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Legge 8 ottobre 2025, n. 151, art. 1: è istituita la festa nazionale di San Francesco d'Assisi da celebrare il 4 ottobre di ogni anno, inserita nell'elenco dei giorni festivi dell'art. 2 della Legge 260/1949 con effetto dal 1 gennaio 2026 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Calendario di Borsa 2026: giornate di chiusura dei mercati, il 1 gennaio, il Venerdì Santo, il Lunedì dell'Angelo, il 1 maggio e il 24, il 25 e il 31 dicembre (Borsa Italiana)
- Art. 2 della Legge 31 marzo 1954, n. 90: la celebrazione del Santo Patrono della località ove si svolge il lavoro è trattata come circostanza distinta dalle festività nazionali (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 8, 2026. All sources