Business Days in February 2027 for Italy
February 2027 has 20 giorni lavorativi under the Italian national holiday calendar. February 2027 contains no Italian national holidays on a weekday. The month covers 28 calendar days, of which 8 are sabato and domenica. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of giorni lavorativi in Italy.
giorni lavorativi
20
Calendar Days
28
Weekend Days
8
festività nazionali
0
Work Weeks
4.0
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 wknd | |
7 wknd | 8 | 9 | 10 | 11 | 12 | 13 wknd |
14 wknd | 15 | 16 | 17 | 18 | 19 | 20 wknd |
21 wknd | 22 | 23 | 24 | 25 | 26 | 27 wknd |
28 wknd |
festività nazionali in February 2027
No Italian national holidays fall on a weekday in February 2027, so the month loses no working day to a holiday on this calendar.
Italy February deadlines
The F24 for January falls due on the 16th, on the same Saturday-and-holiday rule. February carries no festività nazionale, so the month runs its full complement of working days. Two publication claims are worth stating precisely: the Banca d'Italia Rapporto sulla stabilità finanziaria is semi-annual and lands in April and November, not February, and the ECB holds eight Governing Council monetary policy meetings a year on a calendar published in advance, whose months shift from year to year.
Sources for these dates
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Rapporto sulla stabilità finanziaria: semestrale dal 2012, pubblicato in aprile e in novembre (Banca d'Italia)
- Governing Council monetary policy meeting calendar, published in advance (European Central Bank)
Checked October 7, 2026. All sources
Day-of-Week Distribution
The count of each weekday in February 2027. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 4 |
| Tuesday | 4 |
| Wednesday | 4 |
| Thursday | 4 |
| Friday | 4 |
| Saturday | 4 |
| Sunday | 4 |
Italy reporting cycles and business-day rules
Italian business-day cycles run on the F24, which carries withholding and the monthly liquidazione IVA and falls due on the 16th of the following month; where the 16th is a Saturday or a holiday, payment is timely on the first working day after it. Anything falling due between 1 and 20 August may be settled by 20 August with no surcharge, which is a standing rule and not an annual concession. Filing and payment are separate obligations and the dates differ: the Modello Redditi is filed telematically between 15 April and 31 October, for individuals and for companies whose tax period ends in December, while the balance and the first advance instalment fall due on 30 June, or thirty days later with a 0.40 per cent uplift, and the second advance instalment falls in November. The Certificazione Unica goes to the people it covers by 16 March. Euro wholesale settlement runs on T2, which TARGET2 became in March 2023, and Banca d'Italia continues to operate BI-Comp for retail clearing.
Sources for these rules
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 1 del D.P.R. 23 marzo 1998, n. 100: entro il giorno 16 di ciascun mese il contribuente liquida e versa l'IVA del mese precedente, e il versamento relativo al mese di dicembre è effettuato entro il giorno 16 del mese successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 11 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: gli adempimenti fiscali e i versamenti che hanno scadenza dal 1° al 20 agosto di ogni anno possono essere effettuati entro il giorno 20 dello stesso mese, senza alcuna maggiorazione (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 17 del D.P.R. 7 dicembre 2001, n. 435: il saldo delle persone fisiche è versato entro il 30 giugno e quello IRES entro l'ultimo giorno del sesto mese successivo alla chiusura, con facoltà di versare entro il trentesimo giorno successivo maggiorando dello 0,40 per cento; l'acconto è dovuto in due rate, la prima al termine del saldo e la seconda nel mese di novembre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
Checked October 7, 2026. All sources
February 2027 giorni lavorativi compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows February 2027 under 11 of the site's 25 holiday calendars; the summary above gives Italy's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 19 | Presidents' Day |
| 🇬🇧United Kingdom | 20 | None |
| 🇨🇦Canada | 20 | None |
| 🇦🇺Australia | 20 | None |
| 🇮🇳India | 20 | None |
| 🇵🇭Philippines | 20 | None |
| 🇫🇷France | 20 | None |
| 🇩🇪Germany | 20 | None |
| 🇯🇵Japan | 18 | National Foundation Day, Emperor's Birthday |
| 🇲🇽Mexico | 19 | Día de la Constitución |
| 🇸🇬Singapore | 19 | Chinese New Year Day 2 (observed) |
How February 2027 compares year over year
February 2026 also had 20 giorni lavorativi, so the working capacity is unchanged year over year. On the surrounding months, January 2027 has 19 giorni lavorativi and March 2027 has 22. Looking forward, February 2028 has 21 giorni lavorativi under the same Italian national holiday calendar.
Using this calculator in Italy
A Milan corporate controller uses the 20-day February 2027 count to line T2 settlement up with the F24 deadline on the 16th, and to see where that 16th rolls onto the first following working day. A Rome law firm counts giorni lavorativi against D.Lgs. 231/2002, which caps commercial payment at 30 days unless a longer period is expressly agreed and provable in writing, and against INPS contribution cycles: ENPALS was suppressed in 2012 and its functions passed to INPS. A Florence manufacturing controller uses the count to separate the Certificazione Unica, delivered to employees by 16 March, from the Modello Redditi filing window that closes on 31 October.
Sources for these rules
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4 del D.Lgs. 9 ottobre 2002, n. 231: il periodo di pagamento non può superare trenta giorni, i termini superiori a sessanta giorni devono essere pattuiti espressamente e provati per iscritto, e verso una pubblica amministrazione non possono comunque superare sessanta giorni (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 21 del D.L. 6 dicembre 2011, n. 201: l'INPDAP e l'ENPALS sono soppressi dal 1 gennaio 2012 e le relative funzioni sono attribuite all'INPS (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 7, 2026. All sources
How February 2027 is shaped
The headline count answers how many giorni lavorativi February 2027 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Italian national holiday calendar and a working week that treats sabato and domenica as the weekend, with no assumption about how any particular obligation behaves.
The only month whose length changes
February is the shortest month and the only one whose length is not fixed, running 28 days in a common year and 29 in a leap year. A 28-day February is exactly four seven-day cycles, which makes it the only month capable of containing precisely four of every weekday. February 2027 runs 28 days, so it has that perfectly regular shape.
In February 2027 that comes to 20 giorni lavorativi across 28 calendar days, against 19 in January 2027 and 22 in March 2027.
A clean start to the working week
February 2027 opens on the first working day of the week. That is the alignment where the month's own numbering and the working week agree: week one of the month is a whole working week that belongs entirely to February, with nothing borrowed from the month before. Of the 5 possible starts this is the only one where "the first week" and "the first 5 giorni lavorativi" describe the same span.
The opening stretch runs from Monday, February 1 to February 5, five giorni lavorativi before the first break. February 2027 carries 20 giorni lavorativi in total, so that opening block is 25% of the month's working capacity.
How the working days break up
The working days of February 2027 fall into four separate stretches. The count of stretches matters more than it looks: a month's total is the sum of its runs, but a deliverable that needs consecutive days is limited by the longest single run, and the two numbers move independently.
The working days of February 2027 arrive in stretches of 5, 5, 5, and 5 days. The longest unbroken stretch runs five days, from February 1 to February 5. A task needing more consecutive giorni lavorativi than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is balanced end to end. Its opening and closing stretches are the same length, five days each, so work pushed from the start of February to its end finds the same amount of room it left behind. That symmetry is the exception rather than the rule.
The only perfectly regular month
A 28-day February is exactly four seven-day cycles, so every weekday occurs four times and no weekday is over-represented. It is the only month of the year that can be perfectly regular, and it means February's working-day count in a common year depends on nothing but its holidays: the weekday alignment cannot change the answer.
Only Monday, Tuesday, Wednesday, Thursday, and Friday among them are working days, so part of the surplus is absorbed by the sabato and domenica weekend and never reaches the working total. That split is why two months of the same length can carry different working-day counts without any holiday being involved.
A month with no closures, and a lean one
No Italian national holiday falls anywhere in February 2027. When a month carries no closure, its working-day count is decided entirely by which weekday it opens on and how long it runs, so the whole of the difference between this month and its neighbours is calendar alignment. Here that alignment produces 20 giorni lavorativi, at the low end of what a 28-day month can yield.
A short count with no holiday in it is worth flagging on a plan, because the usual explanation does not apply: nothing was lost to a closure. The month simply begins and ends in positions that put more of its days on the sabato and domenica weekend.
The closures on either side of the month
Nothing closes inside February 2027 under the Italian national calendar, so the useful question is what sits on either side of it. Adjacent closures matter to a monthly plan because deadlines that fall near a month boundary are usually satisfied on the other side of it.
Looking outside the month, the last was Epifania on January 6, 2027, 26 calendar days before February began and the next is Lunedì dell'Angelo on March 29, 2027, 29 calendar days after it ends.
Across the whole of 2027 the Italian national calendar puts seven closures on working days, of which none falls in February. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
The month ends over a weekend
February 2027 ends on a Sunday, which this calendar treats as weekend. Month-end processing cannot happen on the last calendar day, so it happens earlier and the last few dates of the month carry no settlement at all. The distance between the final working day and the final calendar day is where month-end reconciliations go missing.
The last working day of February 2027 is Friday, February 26. Counting back from there, the third-to-last is Wednesday, February 24, four calendar days before the month closes.
The working month ends on the last working day of a week, so the final stretch is a complete one and nothing is left hanging mid-week. Two calendar days of February follow it with nothing settling on them.
The middle month of the quarter
February is the middle month of Q1. Middle months carry the least visibility in a quarterly cycle: the opening month sets expectations and the closing month is where they are settled, so a shortfall here is the one most likely to be noticed late.
Across the whole quarter there are 61 giorni lavorativi, of which 20 fall in February. The other two months carry January 2027 with 19 and March 2027 with 22. It sits between the other two, which makes it the month where a quarterly plan is least likely to be thrown off by the calendar alone.
Every working weekday occurs the same number of times
February 2027 works each weekday of its week the same number of times. That is the flat case, and it is the only one where a weekly recurring commitment costs the same whichever weekday it is pinned to. It happens when the month's length and its closures happen to cancel, not because the month is regular: the calendar census above and this one can agree for quite different reasons.
Counted as worked rather than as occurring, February 2027 gives Monday 4, Tuesday 4, Wednesday 4, Thursday 4, and Friday 4. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
Toward the short end of the year
February sits among the shorter working months of 2027 under the Italian national calendar. A month reaches this end of the ranking either by being short or by absorbing closures, and the two produce the same headline number while behaving differently: a closure fragments the month, a shorter calendar does not.
2027 carries 254 giorni lavorativi in total under the Italian national calendar. The longest month of the year is March 2027 with 22 and the shortest is January 2027 with 19, a spread of 3. February ranks 10th of the twelve with 20.
Italy closures across the year
A month's working-day count only means something against the country's whole calendar. Two countries that share a weekend and happen to have the same closure-free month can still run very different years, and Italy is placed as follows.
Across 2027 the Italian national closures fall 3 in Q1, 1 in Q2, 0 in Q3, and 3 in Q4. A further five holidays land on the sabato and domenica weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2027 calendar sits between June 2, 2027 and October 4, 2027, 124 calendar days with no Italian national closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
Where the month sits in the year's closure pattern
Closures are not spread evenly across a calendar year. They cluster around fixed anniversaries and around whichever lunar or movable feasts a jurisdiction observes, so two adjacent months can carry very different loads, and the Italian national calendar is no exception.
2027 opens its Italian national closures with Capodanno on January 1, 2027 and ends them with Immacolata Concezione on December 8, 2027. The densest month of the year is January 2027 with two closures on working days.
The same count as last year
February 2027 and February 2026 carry the same number of giorni lavorativi, 20 in each. An unchanged total does not mean an unchanged month: the working days sit on different dates and break into different stretches, so a schedule copied forward date by date will not line up even though the capacity has not moved.
February opens 2026 on a Sunday, 2027 on a Monday, and 2028 on a Tuesday. That movement, one weekday in a common year and two after a leap day, is what makes the three counts differ. The number of closures on working days is the same in both years, so the whole of any difference comes from weekday alignment. Looking ahead, February 2028 carries 21 giorni lavorativi.
Where the month's anchor dates fall
Two of the common monthly anchor dates in February 2027 land outside the working week or on a closure. The table below resolves each one against the Italian national calendar, together with the first working day on or after it.
| Date | Weekday | Status under the Italian national calendar | First working day on or after |
|---|---|---|---|
| February 1 | Monday | Working day | February 1 |
| February 5 | Friday | Working day | February 5 |
| February 10 | Wednesday | Working day | February 10 |
| February 15 | Monday | Working day | February 15 |
| February 20 | Saturday | Weekend | February 22, 2027 |
| February 25 | Thursday | Working day | February 25 |
| February 28 | Sunday | Weekend | March 1, 2027 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in February 2027
An invoice dated the 1st of February on calendar-day Net 30 terms comes due on March 3, 2027, a working day under the Italian national calendar. Terms counted in calendar days move independently of the working week, so the same term written on two consecutive months can settle cleanly in one and roll across a closure in the other.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated February 1 | March 3, 2027 | April 2, 2027 |
| Dated February 15 | March 17, 2027 | April 16, 2027 |
| Dated February 28 | March 30, 2027 | April 29, 2027 |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Italy calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Normattiva (normattiva.it) (opens in a new tab)
Cross-checked against this source on September 10, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in February 2027 under the Italian national holiday calendar?
Which Italy holidays affect February 2027?
Is Santo Stefano (December 26) observed as a national holiday in Italy?
How does the Festa del Patrono affect this national calendar?
Why does the business-day count vary year to year?
When is the last working day of February 2027?
How many working days in a row does February 2027 offer?
Sources for these rules
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Legge 8 ottobre 2025, n. 151, art. 1: è istituita la festa nazionale di San Francesco d'Assisi da celebrare il 4 ottobre di ogni anno, inserita nell'elenco dei giorni festivi dell'art. 2 della Legge 260/1949 con effetto dal 1 gennaio 2026 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Calendario di Borsa 2026: giornate di chiusura dei mercati, il 1 gennaio, il Venerdì Santo, il Lunedì dell'Angelo, il 1 maggio e il 24, il 25 e il 31 dicembre (Borsa Italiana)
- Art. 2 della Legge 31 marzo 1954, n. 90: la celebrazione del Santo Patrono della località ove si svolge il lavoro è trattata come circostanza distinta dalle festività nazionali (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 8, 2026. All sources