Business Days in March 2027 for Italy
March 2027 has 22 giorni lavorativi under the Italian national holiday calendar. March 2027 contains one Italian national holiday on a weekday. The month covers 31 calendar days, of which 8 are sabato and domenica. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of giorni lavorativi in Italy.
giorni lavorativi
22
Calendar Days
31
Weekend Days
8
festività nazionali
1
Work Weeks
4.4
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 wknd | |
7 wknd | 8 | 9 | 10 | 11 | 12 | 13 wknd |
14 wknd | 15 | 16 | 17 | 18 | 19 | 20 wknd |
21 wknd | 22 | 23 | 24 | 25 | 26 | 27 wknd |
28 wknd | 29 Lunedì dell'Angelo | 30 | 31 |
festività nazionali in March 2027
Italy March deadlines
The F24 for February falls due on the 16th. The Certificazione Unica must be delivered to the people it covers by 16 March, which is the deadline that binds the sostituto d'imposta towards them. Quarterly IVA filers settle the annual balance by 16 March, or later with a 0.40 per cent uplift for each month or part month. The Banca d'Italia Bollettino economico is quarterly and publishes in January, April, July and October, so March does not carry one.
Sources for these dates
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 7 del D.P.R. 14 ottobre 1999, n. 542: i contribuenti minori possono optare per la liquidazione trimestrale, versando entro il 16 del secondo mese successivo a ciascuno dei primi tre trimestri solari, e il saldo entro il 16 di marzo con la maggiorazione dello 0,40 per cento oltre tale data (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Bollettino economico: pubblicazione trimestrale, in gennaio, aprile, luglio e ottobre (Banca d'Italia)
Checked October 8, 2026. All sources
Day-of-Week Distribution
The count of each weekday in March 2027. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 5 |
| Tuesday | 5 |
| Wednesday | 5 |
| Thursday | 4 |
| Friday | 4 |
| Saturday | 4 |
| Sunday | 4 |
Italy reporting cycles and business-day rules
Italian business-day cycles run on the F24, which carries withholding and the monthly liquidazione IVA and falls due on the 16th of the following month; where the 16th is a Saturday or a holiday, payment is timely on the first working day after it. Anything falling due between 1 and 20 August may be settled by 20 August with no surcharge, which is a standing rule and not an annual concession. Filing and payment are separate obligations and the dates differ: the Modello Redditi is filed telematically between 15 April and 31 October, for individuals and for companies whose tax period ends in December, while the balance and the first advance instalment fall due on 30 June, or thirty days later with a 0.40 per cent uplift, and the second advance instalment falls in November. The Certificazione Unica goes to the people it covers by 16 March. Euro wholesale settlement runs on T2, which TARGET2 became in March 2023, and Banca d'Italia continues to operate BI-Comp for retail clearing.
Sources for these rules
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 1 del D.P.R. 23 marzo 1998, n. 100: entro il giorno 16 di ciascun mese il contribuente liquida e versa l'IVA del mese precedente, e il versamento relativo al mese di dicembre è effettuato entro il giorno 16 del mese successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 11 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: gli adempimenti fiscali e i versamenti che hanno scadenza dal 1° al 20 agosto di ogni anno possono essere effettuati entro il giorno 20 dello stesso mese, senza alcuna maggiorazione (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 17 del D.P.R. 7 dicembre 2001, n. 435: il saldo delle persone fisiche è versato entro il 30 giugno e quello IRES entro l'ultimo giorno del sesto mese successivo alla chiusura, con facoltà di versare entro il trentesimo giorno successivo maggiorando dello 0,40 per cento; l'acconto è dovuto in due rate, la prima al termine del saldo e la seconda nel mese di novembre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
Checked October 7, 2026. All sources
March 2027 giorni lavorativi compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows March 2027 under 11 of the site's 25 holiday calendars; the summary above gives Italy's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 23 | None |
| 🇬🇧United Kingdom | 21 | Good Friday, Easter Monday |
| 🇨🇦Canada | 22 | Good Friday |
| 🇦🇺Australia | 21 | Good Friday, Easter Monday |
| 🇮🇳India | 21 | Eid ul-Fitr, Good Friday |
| 🇵🇭Philippines | 20 | Eid'l Fitr (approximate), Maundy Thursday, Good Friday |
| 🇫🇷France | 22 | Lundi de Pâques |
| 🇩🇪Germany | 21 | Karfreitag, Ostermontag |
| 🇯🇵Japan | 22 | Vernal Equinox Day (observed) |
| 🇲🇽Mexico | 22 | Natalicio de Benito Juárez |
| 🇸🇬Singapore | 21 | Hari Raya Puasa, Good Friday |
How March 2027 compares year over year
March 2026 also had 22 giorni lavorativi, so the working capacity is unchanged year over year. On the surrounding months, February 2027 has 20 giorni lavorativi and April 2027 has 22. Looking forward, March 2028 has 23 giorni lavorativi under the same Italian national holiday calendar.
Using this calculator in Italy
A Milan corporate controller uses the 22-day March 2027 count to line T2 settlement up with the F24 deadline on the 16th, and to see where that 16th rolls onto the first following working day. A Rome law firm counts giorni lavorativi against D.Lgs. 231/2002, which caps commercial payment at 30 days unless a longer period is expressly agreed and provable in writing, and against INPS contribution cycles: ENPALS was suppressed in 2012 and its functions passed to INPS. A Florence manufacturing controller uses the count to separate the Certificazione Unica, delivered to employees by 16 March, from the Modello Redditi filing window that closes on 31 October.
Sources for these rules
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4 del D.Lgs. 9 ottobre 2002, n. 231: il periodo di pagamento non può superare trenta giorni, i termini superiori a sessanta giorni devono essere pattuiti espressamente e provati per iscritto, e verso una pubblica amministrazione non possono comunque superare sessanta giorni (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 21 del D.L. 6 dicembre 2011, n. 201: l'INPDAP e l'ENPALS sono soppressi dal 1 gennaio 2012 e le relative funzioni sono attribuite all'INPS (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 7, 2026. All sources
How March 2027 is shaped
The headline count answers how many giorni lavorativi March 2027 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Italian national holiday calendar and a working week that treats sabato and domenica as the weekend, with no assumption about how any particular obligation behaves.
The month that closes the first quarter
March closes Q1 and is one of the seven 31-day months. Because it ends a quarter, its final working day is also the quarter's final working day, so a March count carries two boundaries rather than one. It is also the month in which the Gregorian year's day-of-week pattern first repeats: March and November always share the same weekday alignment in any given year.
In March 2027 that comes to 22 giorni lavorativi across 31 calendar days, against 20 in February 2027 and 22 in April 2027.
A clean start to the working week
March 2027 opens on the first working day of the week. That is the alignment where the month's own numbering and the working week agree: week one of the month is a whole working week that belongs entirely to March, with nothing borrowed from the month before. Of the 5 possible starts this is the only one where "the first week" and "the first 5 giorni lavorativi" describe the same span.
The opening stretch runs from Monday, March 1 to March 5, five giorni lavorativi before the first break. March 2027 carries 22 giorni lavorativi in total, so that opening block is 23% of the month's working capacity.
Five working stretches
March splits into five working stretches. That is the ordinary shape of a month whose only interruptions are its weekends, and it means the month's internal boundaries are all predictable a year in advance: nothing here depends on a holiday date moving.
The working days of March 2027 arrive in stretches of 5, 5, 5, 5, and 2 days. The longest unbroken stretch runs five days, from March 1 to March 5. A task needing more consecutive giorni lavorativi than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is front-loaded. It opens with five consecutive days and closes with two, so capacity thins toward the end. Work deferred out of the first stretch arrives in a shorter one, which is how a schedule that looked comfortable in week one stops fitting.
Three weekdays occur five times
A 31-day month contains four full seven-day cycles and three days over, so exactly three weekdays occur five times and the other four occur four times. In March 2027 the three are Monday, Tuesday, and Wednesday. Which three it is follows entirely from the weekday the month opens on, which is why the working-day count of a 31-day month moves year to year even when its holidays do not.
All of them are working days here, so the surplus lands entirely on the working week: Monday, Tuesday, and Wednesday each occur 5 times. A weekend of two days can take at most two of them, and had it done so the same month would carry 20 giorni lavorativi rather than 22.
One closure, and where it lands
March 2027 carries a single Italian national closure on a working day: Lunedì dell'Angelo on Monday, March 29. A holiday's cost to a month is not only the day it removes; it is also where the removal falls, because the same closure can extend an existing break or cut a working stretch in half.
It sits directly beside a weekend rather than inside a working week, so it extends an existing break instead of creating a new one. That is the cheapest position a holiday can occupy: the month loses a day but keeps its shape.
20 working days pass before the closure and only 2 follow it. With the break past the midpoint, most of the month's capacity has already been spent when it arrives, so anything the closure displaces competes for a shrinking remainder.
The closures around this month
March 2027 carries one Italian national closure of its own, and the months on either side add their own. Where a deadline sits close to a month boundary, the closure that moves it is as likely to be outside the month as inside it.
Looking outside the month, the last was Epifania on January 6, 2027, 54 calendar days before March began and the next is Festa della Repubblica on June 2, 2027, 63 calendar days after it ends.
Across the whole of 2027 the Italian national calendar puts seven closures on working days, of which one falls in March. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
A midweek close
The month ends in the middle of a working week. Two working days of the final calendar week fall in March and the remainder in the month after, which makes the closing week a partial period on both sides. A midweek close is the pattern most likely to push month-end tasks into the following month by default, simply because the week continues past the boundary.
The last working day of March 2027 is Wednesday, March 31. Counting back from there, the third-to-last is Friday, March 26, five calendar days before the month closes.
The quarter closes here
March closes Q1, so the quarter's last working day and this month's last working day are the same date. Everything the quarter has deferred arrives inside these 22 giorni lavorativi, and there is no further month in the period to move it into.
Across the whole quarter there are 61 giorni lavorativi, of which 22 fall in March. The other two months carry January 2027 with 19 and February 2027 with 20. It is the largest of the three, so work deferred out of March lands in a month with less room than this one had.
The week's first working day is the scarcest
The first working day of the week is the one March gives least often. Anything anchored to the start of the working week (a weekly kickoff, a Monday-morning cutoff, a start-of-week batch) fires fewer times this month than the calendar count suggests, because a closure has taken one of them out.
Counted as worked rather than as occurring, March 2027 gives Monday 4, Tuesday 5, Wednesday 5, Thursday 4, and Friday 4. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
One of the year's longest working months
No month of 2027 carries more giorni lavorativi than March under the Italian national calendar. A year's working days are not distributed evenly across its twelve months, and the gap between the longest and the shortest is wide enough that a target divided by twelve is wrong in both directions.
2027 carries 254 giorni lavorativi in total under the Italian national calendar. The longest month of the year is March 2027 with 22 and the shortest is January 2027 with 19, a spread of 3. March ranks 1st of the twelve with 22.
Italy closures across the year
A month's working-day count only means something against the country's whole calendar. Two countries that share a weekend and happen to have the same closure-free month can still run very different years, and Italy is placed as follows.
Across 2027 the Italian national closures fall 3 in Q1, 1 in Q2, 0 in Q3, and 3 in Q4. A further five holidays land on the sabato and domenica weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2027 calendar sits between June 2, 2027 and October 4, 2027, 124 calendar days with no Italian national closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
Where the month sits in the year's closure pattern
Closures are not spread evenly across a calendar year. They cluster around fixed anniversaries and around whichever lunar or movable feasts a jurisdiction observes, so two adjacent months can carry very different loads, and the Italian national calendar is no exception.
2027 opens its Italian national closures with Capodanno on January 1, 2027 and ends them with Immacolata Concezione on December 8, 2027. The densest month of the year is January 2027 with two closures on working days.
The same count as last year
March 2027 and March 2026 carry the same number of giorni lavorativi, 22 in each. An unchanged total does not mean an unchanged month: the working days sit on different dates and break into different stretches, so a schedule copied forward date by date will not line up even though the capacity has not moved.
March opens 2026 on a Sunday, 2027 on a Monday, and 2028 on a Wednesday. That movement, one weekday in a common year and two after a leap day, is what makes the three counts differ. The count of closures on working days differs between the two years as well, so alignment is not the only thing moving. Looking ahead, March 2028 carries 23 giorni lavorativi.
Where the month's anchor dates fall
One of the common monthly anchor dates in March 2027 lands outside the working week or on a closure. The table below resolves each one against the Italian national calendar, together with the first working day on or after it.
| Date | Weekday | Status under the Italian national calendar | First working day on or after |
|---|---|---|---|
| March 1 | Monday | Working day | March 1 |
| March 5 | Friday | Working day | March 5 |
| March 10 | Wednesday | Working day | March 10 |
| March 15 | Monday | Working day | March 15 |
| March 20 | Saturday | Weekend | March 22, 2027 |
| March 25 | Thursday | Working day | March 25 |
| March 31 | Wednesday | Working day | March 31 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in March 2027
An invoice dated the 1st of March on calendar-day Net 30 terms comes due on March 31, 2027, a working day under the Italian national calendar. Terms counted in calendar days move independently of the working week, so the same term written on two consecutive months can settle cleanly in one and roll across a closure in the other.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated March 1 | March 31, 2027 | April 30, 2027 |
| Dated March 15 | April 14, 2027 | May 14, 2027 |
| Dated March 31 | April 30, 2027 | May 30, 2027 (rolls to May 31, 2027) |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Italy calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Normattiva (normattiva.it) (opens in a new tab)
Cross-checked against this source on September 10, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in March 2027 under the Italian national holiday calendar?
Which Italy holidays affect March 2027?
Is Santo Stefano (December 26) observed as a national holiday in Italy?
How does the Festa del Patrono affect this national calendar?
Why does the business-day count vary year to year?
When is the last working day of March 2027?
How many working days in a row does March 2027 offer?
Sources for these rules
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Legge 8 ottobre 2025, n. 151, art. 1: è istituita la festa nazionale di San Francesco d'Assisi da celebrare il 4 ottobre di ogni anno, inserita nell'elenco dei giorni festivi dell'art. 2 della Legge 260/1949 con effetto dal 1 gennaio 2026 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Calendario di Borsa 2026: giornate di chiusura dei mercati, il 1 gennaio, il Venerdì Santo, il Lunedì dell'Angelo, il 1 maggio e il 24, il 25 e il 31 dicembre (Borsa Italiana)
- Art. 2 della Legge 31 marzo 1954, n. 90: la celebrazione del Santo Patrono della località ove si svolge il lavoro è trattata come circostanza distinta dalle festività nazionali (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 8, 2026. All sources