Business Days in June 2027 for Italy
June 2027 has 21 giorni lavorativi under the Italian national holiday calendar. June 2027 contains one Italian national holiday on a weekday. The month covers 30 calendar days, of which 8 are sabato and domenica. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of giorni lavorativi in Italy.
giorni lavorativi
21
Calendar Days
30
Weekend Days
8
festività nazionali
1
Work Weeks
4.2
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 | 2 Festa della Repubblica | 3 | 4 | 5 wknd | ||
6 wknd | 7 | 8 | 9 | 10 | 11 | 12 wknd |
13 wknd | 14 | 15 | 16 | 17 | 18 | 19 wknd |
20 wknd | 21 | 22 | 23 | 24 | 25 | 26 wknd |
27 wknd | 28 | 29 | 30 |
festività nazionali in June 2027
Italy June deadlines
The Festa della Repubblica on 2 June is a giorno festivo. The F24 for May falls due on the 16th. June is a payment month rather than a filing month, and the distinction matters: the balance shown by the return and the first advance instalment are both due on 30 June for individuals, with the option of paying within the following thirty days by adding 0.40 per cent. The filing deadline itself is 31 October and does not move with the payment.
Sources for these dates
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 17 del D.P.R. 7 dicembre 2001, n. 435: il saldo delle persone fisiche è versato entro il 30 giugno e quello IRES entro l'ultimo giorno del sesto mese successivo alla chiusura, con facoltà di versare entro il trentesimo giorno successivo maggiorando dello 0,40 per cento; l'acconto è dovuto in due rate, la prima al termine del saldo e la seconda nel mese di novembre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 7, 2026. All sources
Day-of-Week Distribution
The count of each weekday in June 2027. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 4 |
| Tuesday | 5 |
| Wednesday | 5 |
| Thursday | 4 |
| Friday | 4 |
| Saturday | 4 |
| Sunday | 4 |
Italy reporting cycles and business-day rules
Italian business-day cycles run on the F24, which carries withholding and the monthly liquidazione IVA and falls due on the 16th of the following month; where the 16th is a Saturday or a holiday, payment is timely on the first working day after it. Anything falling due between 1 and 20 August may be settled by 20 August with no surcharge, which is a standing rule and not an annual concession. Filing and payment are separate obligations and the dates differ: the Modello Redditi is filed telematically between 15 April and 31 October, for individuals and for companies whose tax period ends in December, while the balance and the first advance instalment fall due on 30 June, or thirty days later with a 0.40 per cent uplift, and the second advance instalment falls in November. The Certificazione Unica goes to the people it covers by 16 March. Euro wholesale settlement runs on T2, which TARGET2 became in March 2023, and Banca d'Italia continues to operate BI-Comp for retail clearing.
Sources for these rules
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 1 del D.P.R. 23 marzo 1998, n. 100: entro il giorno 16 di ciascun mese il contribuente liquida e versa l'IVA del mese precedente, e il versamento relativo al mese di dicembre è effettuato entro il giorno 16 del mese successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 11 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: gli adempimenti fiscali e i versamenti che hanno scadenza dal 1° al 20 agosto di ogni anno possono essere effettuati entro il giorno 20 dello stesso mese, senza alcuna maggiorazione (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 17 del D.P.R. 7 dicembre 2001, n. 435: il saldo delle persone fisiche è versato entro il 30 giugno e quello IRES entro l'ultimo giorno del sesto mese successivo alla chiusura, con facoltà di versare entro il trentesimo giorno successivo maggiorando dello 0,40 per cento; l'acconto è dovuto in due rate, la prima al termine del saldo e la seconda nel mese di novembre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
Checked October 7, 2026. All sources
June 2027 giorni lavorativi compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows June 2027 under 11 of the site's 25 holiday calendars; the summary above gives Italy's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 21 | Juneteenth (observed) |
| 🇬🇧United Kingdom | 22 | None |
| 🇨🇦Canada | 22 | None |
| 🇦🇺Australia | 21 | King's Birthday |
| 🇮🇳India | 21 | Muharram |
| 🇵🇭Philippines | 22 | None |
| 🇫🇷France | 22 | None |
| 🇩🇪Germany | 22 | None |
| 🇯🇵Japan | 22 | None |
| 🇲🇽Mexico | 22 | None |
| 🇸🇬Singapore | 22 | None |
How June 2027 compares year over year
June 2026 also had 21 giorni lavorativi, so the working capacity is unchanged year over year. On the surrounding months, May 2027 has 21 giorni lavorativi and July 2027 has 22. Looking forward, June 2028 has 21 giorni lavorativi under the same Italian national holiday calendar.
Using this calculator in Italy
A Milan corporate controller uses the 21-day June 2027 count to line T2 settlement up with the F24 deadline on the 16th, and to see where that 16th rolls onto the first following working day. A Rome law firm counts giorni lavorativi against D.Lgs. 231/2002, which caps commercial payment at 30 days unless a longer period is expressly agreed and provable in writing, and against INPS contribution cycles: ENPALS was suppressed in 2012 and its functions passed to INPS. A Florence manufacturing controller uses the count to separate the Certificazione Unica, delivered to employees by 16 March, from the Modello Redditi filing window that closes on 31 October.
Sources for these rules
- T2, il regolamento dei pagamenti all'ingrosso: con il consolidamento completato a marzo 2023 TARGET2 si è evoluto nel sistema T2, mentre BI-Comp resta la compensazione multilaterale dei pagamenti al dettaglio (Banca d'Italia)
- Art. 8, comma 1, del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33), dal 1° gennaio 2027: le somme sono versate entro il giorno 16 del mese di scadenza e, se il termine scade di sabato o di giorno festivo, il versamento è tempestivo se effettuato il primo giorno lavorativo successivo (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 243 del testo unico in materia di versamenti e di riscossione (allegato al D.Lgs. 24 marzo 2025, n. 33): le disposizioni del testo unico si applicano a decorrere dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 4, del D.L. 31 dicembre 2025, n. 200, convertito dalla L. 27 febbraio 2026, n. 26: nell'art. 243 del testo unico in materia di versamenti e di riscossione la data del 1° gennaio 2026 è sostituita dal 1° gennaio 2027 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4 del D.Lgs. 9 ottobre 2002, n. 231: il periodo di pagamento non può superare trenta giorni, i termini superiori a sessanta giorni devono essere pattuiti espressamente e provati per iscritto, e verso una pubblica amministrazione non possono comunque superare sessanta giorni (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 21 del D.L. 6 dicembre 2011, n. 201: l'INPDAP e l'ENPALS sono soppressi dal 1 gennaio 2012 e le relative funzioni sono attribuite all'INPS (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 4, comma 6-quater, del D.P.R. 22 luglio 1998, n. 322: le certificazioni uniche sono consegnate agli interessati entro il 16 marzo dell'anno successivo a quello in cui le somme e i valori sono stati corrisposti (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Art. 2 del D.P.R. 22 luglio 1998, n. 322: le persone fisiche presentano la dichiarazione in via telematica tra il 15 aprile e il 31 ottobre dell'anno successivo, e i soggetti IRES entro l'ultimo giorno del decimo mese successivo alla chiusura del periodo d'imposta (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 7, 2026. All sources
How June 2027 is shaped
The headline count answers how many giorni lavorativi June 2027 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Italian national holiday calendar and a working week that treats sabato and domenica as the weekend, with no assumption about how any particular obligation behaves.
The month that closes the first half of the year
June runs 30 days, closes Q2 and closes the first half of the calendar year, so its last working day carries three boundaries at once: month, quarter and half-year. It is one of only two months that can do that. June and February also share a weekday alignment in a common year, which means a June calendar is the February calendar extended by two days.
In June 2027 that comes to 21 giorni lavorativi across 30 calendar days, against 21 in May 2027 and 22 in July 2027.
A start one day into the week
The 1st falls on the second working day of the week, so June inherits a part-week at the top. One working day of that week was spent in the previous month, which is why a month opening here reads short at the beginning and long at the end. Reporting cut on calendar weeks and reporting cut on the calendar month disagree about where the period starts, and the gap is exactly one working day.
The month's first working day is Tuesday, June 1, and June 2027 carries 21 giorni lavorativi in total.
Six working stretches
The month's working days fall into six stretches. Six is the shape a month takes when its weekends divide it evenly and at least one closure lands inside a working week rather than beside one, so the fragmentation is not simply a function of the month's length.
The working days of June 2027 arrive in stretches of 1, 2, 5, 5, 5, and 3 days. The longest unbroken stretch runs five days, from June 7 to June 11. A task needing more consecutive giorni lavorativi than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is back-loaded. It opens with one consecutive day and closes with three, so the room is at the end rather than the start. That is the safer of the two imbalances, because a slip has somewhere to go, but it also makes the opening week a poor sample of the month.
Two weekdays occur five times
Thirty days is four seven-day cycles plus two, so a 30-day month has exactly two weekdays occurring five times and five occurring four times. Here they are Tuesday and Wednesday. The pair is always consecutive, because the surplus days are the first two of the month repeated at its end.
All of them are working days here, so the surplus lands entirely on the working week: Tuesday and Wednesday each occur 5 times. Had the surplus fallen on the weekend instead, the same month would carry 19 giorni lavorativi rather than 21.
One closure, and where it lands
June 2027 carries a single Italian national closure on a working day: Festa della Repubblica on Wednesday, June 2. A holiday's cost to a month is not only the day it removes; it is also where the removal falls, because the same closure can extend an existing break or cut a working stretch in half.
The closure sits inside a working week rather than beside a weekend, so it splits one stretch into two shorter ones. The month loses a day and gains an internal boundary, and the second effect is the one a plan built from the total will miss.
Exactly one working day passes before the closure. A single day of runway is not enough to start anything that has to continue, so in practice the month begins after the break rather than before it.
The closures around this month
June 2027 carries one Italian national closure of its own, and the months on either side add their own. Where a deadline sits close to a month boundary, the closure that moves it is as likely to be outside the month as inside it.
Looking outside the month, the last was Lunedì dell'Angelo on March 29, 2027, 64 calendar days before June began and the next is San Francesco d'Assisi on October 4, 2027, 96 calendar days after it ends.
Across the whole of 2027 the Italian national calendar puts seven closures on working days, of which one falls in June. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
A midweek close
The month ends in the middle of a working week. Two working days of the final calendar week fall in June and the remainder in the month after, which makes the closing week a partial period on both sides. A midweek close is the pattern most likely to push month-end tasks into the following month by default, simply because the week continues past the boundary.
The last working day of June 2027 is Wednesday, June 30. Counting back from there, the third-to-last is Monday, June 28, two calendar days before the month closes.
The quarter closes here
June closes Q2, so the quarter's last working day and this month's last working day are the same date. Everything the quarter has deferred arrives inside these 21 giorni lavorativi, and there is no further month in the period to move it into.
Across the whole quarter there are 64 giorni lavorativi, of which 21 fall in June. The other two months carry April 2027 with 22 and May 2027 with 21. It is the smallest of the three, so the quarter's capacity sits mostly in the other two months and a plan that spreads work evenly across the quarter will over-commit June.
The week's first working day is the scarcest
The first working day of the week is the one June gives least often. Anything anchored to the start of the working week (a weekly kickoff, a Monday-morning cutoff, a start-of-week batch) fires fewer times this month than the calendar count suggests, because a closure has taken one of them out.
Counted as worked rather than as occurring, June 2027 gives Monday 4, Tuesday 5, Wednesday 4, Thursday 4, and Friday 4. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
Where the month sits in the year
June sits in the middle of 2027 by working-day count under the Italian national calendar. The middle of that ranking is where a month's total is least informative on its own, because a mid-ranked month can be a long month carrying closures or a short one carrying none, and the two need different plans.
2027 carries 254 giorni lavorativi in total under the Italian national calendar. The longest month of the year is March 2027 with 22 and the shortest is January 2027 with 19, a spread of 3. June ranks 8th of the twelve with 21.
Inside the year's longest clear run
June 2027 sits inside the longest stretch of 2027 with no Italian national closure in it. Where a month falls relative to its country's closure clusters changes what the same working-day count is worth: an uninterrupted month inside a long clear run behaves differently from one of equal length wedged between two closures.
Across 2027 the Italian national closures fall 3 in Q1, 1 in Q2, 0 in Q3, and 3 in Q4. A further five holidays land on the sabato and domenica weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2027 calendar sits between June 2, 2027 and October 4, 2027, 124 calendar days with no Italian national closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
Where the month sits in the year's closure pattern
Closures are not spread evenly across a calendar year. They cluster around fixed anniversaries and around whichever lunar or movable feasts a jurisdiction observes, so two adjacent months can carry very different loads, and the Italian national calendar is no exception.
2027 opens its Italian national closures with Capodanno on January 1, 2027 and ends them with Immacolata Concezione on December 8, 2027. The densest month of the year is January 2027 with two closures on working days.
The same count as last year
June 2027 and June 2026 carry the same number of giorni lavorativi, 21 in each. An unchanged total does not mean an unchanged month: the working days sit on different dates and break into different stretches, so a schedule copied forward date by date will not line up even though the capacity has not moved.
June opens 2026 on a Monday, 2027 on a Tuesday, and 2028 on a Thursday. The alignment moves every year, by one weekday in a common year and two after a leap day, and here it happens to leave the totals level while changing which dates the working days sit on. The number of closures on working days is the same in both years, so the whole of any difference comes from weekday alignment. Looking ahead, June 2028 carries 21 giorni lavorativi.
Where the month's anchor dates fall
Two of the common monthly anchor dates in June 2027 land outside the working week or on a closure. The table below resolves each one against the Italian national calendar, together with the first working day on or after it.
| Date | Weekday | Status under the Italian national calendar | First working day on or after |
|---|---|---|---|
| June 1 | Tuesday | Working day | June 1 |
| June 5 | Saturday | Weekend | June 7, 2027 |
| June 10 | Thursday | Working day | June 10 |
| June 15 | Tuesday | Working day | June 15 |
| June 20 | Sunday | Weekend | June 21, 2027 |
| June 25 | Friday | Working day | June 25 |
| June 30 | Wednesday | Working day | June 30 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in June 2027
An invoice dated the 1st of June on calendar-day Net 30 terms comes due on July 1, 2027, a working day under the Italian national calendar. Terms counted in calendar days move independently of the working week, so the same term written on two consecutive months can settle cleanly in one and roll across a closure in the other.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated June 1 | July 1, 2027 | July 31, 2027 (rolls to August 2, 2027) |
| Dated June 15 | July 15, 2027 | August 14, 2027 (rolls to August 16, 2027) |
| Dated June 30 | July 30, 2027 | August 29, 2027 (rolls to August 30, 2027) |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Italy calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Normattiva (normattiva.it) (opens in a new tab)
Cross-checked against this source on September 10, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in June 2027 under the Italian national holiday calendar?
Which Italy holidays affect June 2027?
Is Santo Stefano (December 26) observed as a national holiday in Italy?
How does the Festa del Patrono affect this national calendar?
Why does the business-day count vary year to year?
When is the last working day of June 2027?
How many working days in a row does June 2027 offer?
Sources for these rules
- Art. 2 della Legge 27 maggio 1949, n. 260: l'elenco dei giorni festivi, che comprende il giorno 26 dicembre e, dal 1 gennaio 2026, il 4 ottobre (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Legge 8 ottobre 2025, n. 151, art. 1: è istituita la festa nazionale di San Francesco d'Assisi da celebrare il 4 ottobre di ogni anno, inserita nell'elenco dei giorni festivi dell'art. 2 della Legge 260/1949 con effetto dal 1 gennaio 2026 (Normattiva (Istituto Poligrafico e Zecca dello Stato))
- Calendario di Borsa 2026: giornate di chiusura dei mercati, il 1 gennaio, il Venerdì Santo, il Lunedì dell'Angelo, il 1 maggio e il 24, il 25 e il 31 dicembre (Borsa Italiana)
- Art. 2 della Legge 31 marzo 1954, n. 90: la celebrazione del Santo Patrono della località ove si svolge il lavoro è trattata come circostanza distinta dalle festività nazionali (Normattiva (Istituto Poligrafico e Zecca dello Stato))
Checked October 8, 2026. All sources