Business Days in November 2026 for Switzerland
November 2026 has 21 working days under the Swiss federal holiday calendar. November 2026 contains no Swiss federal holidays on a weekday. The month covers 30 calendar days, of which 9 are Saturday and Sunday. That count drives invoice cycles, payroll runs, and any contract that defines deadlines as a number of working days in Switzerland.
working days
21
Calendar Days
30
Weekend Days
9
public holidays
0
Work Weeks
4.2
| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
1 wknd | 2 | 3 | 4 | 5 | 6 | 7 wknd |
8 wknd | 9 | 10 | 11 | 12 | 13 | 14 wknd |
15 wknd | 16 | 17 | 18 | 19 | 20 | 21 wknd |
22 wknd | 23 | 24 | 25 | 26 | 27 | 28 wknd |
29 wknd | 30 |
public holidays in November 2026
No Swiss federal holidays fall on a weekday in November 2026, so the month loses no working day to a holiday on this calendar.
Switzerland November deadlines
Allerheiligen on 1 November is cantonal rather than federal. The Bundesamt für Justiz directory of days treated as public holidays for the calculation of time limits lists it in fifteen of the twenty-six cantons: Luzern, Uri, Schwyz, Obwalden, Nidwalden, Glarus, Zug, Fribourg, Solothurn, Appenzell Innerrhoden, St. Gallen, Aargau, Valais, Ticino and Jura. The MWST return and payment for the third quarter fall due on 29 November, 60 days after the quarter-end under Art. 71 Abs. 1 and Art. 86 Abs. 1 MWSTG.
Sources for these dates
- Verzeichnis der gesetzlichen Feiertage und der Tage, die für die Fristenberechnung wie solche behandelt werden (Art. 11 des Europäischen Übereinkommens über die Berechnung von Fristen) (Bundesamt für Justiz BJ)
- Art. 71 Abs. 1 MWSTG: Abrechnung innert 60 Tagen nach Ablauf der Abrechnungsperiode (Stand 1. Januar 2025) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 86 Abs. 1 MWSTG: Entrichtung der Steuer innert 60 Tagen nach Ablauf der Abrechnungsperiode (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
Checked September 9, 2026. All sources
Day-of-Week Distribution
The count of each weekday in November 2026. Useful for shift scheduling, weekly recurring billing, and any rota that depends on a specific day of the week landing in-month.
| Day | Count |
|---|---|
| Monday | 5 |
| Tuesday | 4 |
| Wednesday | 4 |
| Thursday | 4 |
| Friday | 4 |
| Saturday | 4 |
| Sunday | 5 |
Switzerland reporting cycles and business-day rules
Swiss business-day cycles run on the MWST period and on cantonal holiday law. Art. 35 MWSTG makes the calendar quarter the default Abrechnungsperiode, with half-yearly reporting under the Saldosteuersatz method and monthly or annual reporting only on application. Art. 71 Abs. 1 MWSTG then gives 60 days from the end of the period to file and Art. 86 Abs. 1 MWSTG 60 days to pay, so a quarter ending 31 March falls due on 30 May, 30 June on 29 August, 30 September on 29 November, and 31 December on 1 March, or on 29 February where the following year is a leap year. Returns are filed through the ESTV portal. Only 1 August is a federal public holiday: Art. 20a of the Arbeitsgesetz lets each canton treat up to eight further days as equivalent to a Sunday, which is why cantonal counts differ, and the Bundesamt für Justiz publishes the canton-by-canton directory of days treated as public holidays for the calculation of time limits.
Sources for these rules
- Art. 35 MWSTG: Abrechnung vierteljährlich, halbjährlich nach Saldosteuersätzen, monatlich oder jährlich nur auf Antrag (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 71 Abs. 1 MWSTG: Abrechnung innert 60 Tagen nach Ablauf der Abrechnungsperiode (Stand 1. Januar 2025) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 86 Abs. 1 MWSTG: Entrichtung der Steuer innert 60 Tagen nach Ablauf der Abrechnungsperiode (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Mehrwertsteuer online abrechnen: Einreichung über das ESTV-Portal, Dienst MWST-Abrechnung pro (Eidgenössische Steuerverwaltung ESTV)
- Der 1. August ist der einzige eidgenössische Feiertag; die Kantone dürfen höchstens acht weitere den Sonntagen gleichstellen (Art. 20a ArG) (Schweizerische Eidgenossenschaft (ch.ch))
- Verzeichnis der gesetzlichen Feiertage und der Tage, die für die Fristenberechnung wie solche behandelt werden (Art. 11 des Europäischen Übereinkommens über die Berechnung von Fristen) (Bundesamt für Justiz BJ)
Checked September 9, 2026. All sources
November 2026 working days compared by country
Working-day counts vary across countries because each country observes its own public holidays. The table below shows November 2026 under 11 of the site's 25 holiday calendars; the summary above gives Switzerland's own count.
| Country | Business Days | Holidays this month |
|---|---|---|
| 🇺🇸United States | 19 | Veterans Day, Thanksgiving Day |
| 🇬🇧United Kingdom | 21 | None |
| 🇨🇦Canada | 20 | Remembrance Day |
| 🇦🇺Australia | 21 | None |
| 🇮🇳India | 20 | Guru Nanak Jayanti |
| 🇵🇭Philippines | 19 | All Souls' Day, Bonifacio Day |
| 🇫🇷France | 20 | Armistice 1918 |
| 🇩🇪Germany | 21 | None |
| 🇯🇵Japan | 19 | Culture Day, Labor Thanksgiving Day |
| 🇲🇽Mexico | 20 | Día de la Revolución |
| 🇸🇬Singapore | 20 | Deepavali (observed) |
How November 2026 compares year over year
November 2025 had 20 working days, so November 2026 has 1 more working day year over year. On the surrounding months, October 2026 has 22 working days and December 2026 has 22. Looking forward, November 2027 has 22 working days under the same Swiss federal holiday calendar.
Using this calculator in Switzerland
A Zurich treasury operator uses the 21-day November 2026 count to line up settlement with the MWST cycle, where Art. 71 Abs. 1 MWSTG gives 60 days from the end of the reporting period to file and Art. 86 Abs. 1 MWSTG the same 60 days to pay. A Geneva team tracking the SNB works from the quarterly monetary policy assessment dates the bank publishes in its official event schedule. A Basel controller counts working days across cantons, because Art. 20a of the Arbeitsgesetz lets each canton treat up to eight days besides 1 August as equivalent to a Sunday, so the same week can carry a different number of working days in two cantons.
Sources for these rules
- Art. 71 Abs. 1 MWSTG: Abrechnung innert 60 Tagen nach Ablauf der Abrechnungsperiode (Stand 1. Januar 2025) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Art. 86 Abs. 1 MWSTG: Entrichtung der Steuer innert 60 Tagen nach Ablauf der Abrechnungsperiode (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
- Event schedule: quarterly monetary policy assessments and the Financial Stability Report publication date (Schweizerische Nationalbank SNB)
- Der 1. August ist der einzige eidgenössische Feiertag; die Kantone dürfen höchstens acht weitere den Sonntagen gleichstellen (Art. 20a ArG) (Schweizerische Eidgenossenschaft (ch.ch))
Checked September 9, 2026. All sources
How November 2026 is shaped
The headline count answers how many working days November 2026 contains. It does not answer where they sit, and for anything measured in consecutive days rather than cumulative days that second question is the binding one. What follows is derived entirely from the Swiss federal holiday calendar and a working week that treats Saturday and Sunday as the weekend, with no assumption about how any particular obligation behaves.
The middle month of the final quarter
November runs 30 days and is the middle month of Q4. It shares its weekday alignment with March in every year, so a November calendar is a March calendar with a day removed from the end. Sitting between a quarter opening and a year end, it is the month where deferred work is most often assumed to have room and least often measured.
In November 2026 that comes to 21 working days across 30 calendar days, against 22 in October 2026 and 22 in December 2026.
The month opens across a weekend
The 1st of November is a Sunday, a weekend day under the Swiss federal calendar, whose week runs against a Saturday and Sunday weekend. Nothing that settles on working days moves on it. A month that opens this way loses its first working day to the calendar before any holiday is counted, and monthly cycles keyed to the 1st all resolve forward to the same date, which concentrates them.
The month's first working day is Monday, November 2, and November 2026 carries 21 working days in total.
Five working stretches
November splits into five working stretches. That is the ordinary shape of a month whose only interruptions are its weekends, and it means the month's internal boundaries are all predictable a year in advance: nothing here depends on a holiday date moving.
The working days of November 2026 arrive in stretches of 5, 5, 5, 5, and 1 day. The longest unbroken stretch runs five days, from November 2 to November 6. A task needing more consecutive working days than that cannot be completed inside a single stretch, whatever the month's total looks like.
The month is front-loaded. It opens with five consecutive days and closes with one, so capacity thins toward the end. Work deferred out of the first stretch arrives in a shorter one, which is how a schedule that looked comfortable in week one stops fitting.
Two weekdays occur five times
Thirty days is four seven-day cycles plus two, so a 30-day month has exactly two weekdays occurring five times and five occurring four times. Here they are Sunday and Monday. The pair is always consecutive, because the surplus days are the first two of the month repeated at its end.
Only Monday among them is a working day, so part of the surplus is absorbed by the Saturday and Sunday weekend and never reaches the working total. That split is why two months of the same length can carry different working-day counts without any holiday being involved.
A month with no closures
There is no Swiss federal holiday in November 2026 at all. Because a month with no closure loses working days only to weekends, the count follows directly from the calendar: 30 days, 9 of them on the Saturday and Sunday weekend, leaving 21 working days.
That makes November an unusually predictable month to plan against. Its working structure will be the same shape in any year that opens on the same weekday, and no holiday date can move it.
The closures on either side of the month
Nothing closes inside November 2026 under the Swiss federal calendar, so the useful question is what sits on either side of it. Adjacent closures matter to a monthly plan because deadlines that fall near a month boundary are usually satisfied on the other side of it.
Looking outside the month, the last was Pfingstmontag (Whit Monday) on May 25, 2026, 160 calendar days before November began and the next is Weihnachten (Christmas Day) on December 25, 2026, 25 calendar days after it ends.
Across the whole of 2026 the Swiss federal calendar puts six closures on working days, of which none falls in November. That ratio, rather than the raw count, is what tells you whether a month is carrying more than its share of the year's downtime.
The month ends where a week begins
The final calendar day of November 2026 is the first working day of a week. A single working day of that week belongs to November and the rest to the month following, which is the least amount of closing capacity a month can have. Anything that must be done "in the last week" of November really has to be done before the preceding weekend.
The last working day of November 2026 is Monday, November 30. Counting back from there, the third-to-last is Thursday, November 26, four calendar days before the month closes.
The middle month of the quarter
November is the middle month of Q4. Middle months carry the least visibility in a quarterly cycle: the opening month sets expectations and the closing month is where they are settled, so a shortfall here is the one most likely to be noticed late.
Across the whole quarter there are 65 working days, of which 21 fall in November. The other two months carry October 2026 with 22 and December 2026 with 22. It is the smallest of the three, so the quarter's capacity sits mostly in the other two months and a plan that spreads work evenly across the quarter will over-commit November.
The week's second working day is the scarcest
The second working day of the week is the one November gives least often. Weekly cycles that run one day behind the start of the week, which is where most reporting handovers sit, lose an occurrence relative to the rest.
Counted as worked rather than as occurring, November 2026 gives Monday 5, Tuesday 4, Wednesday 4, Thursday 4, and Friday 4. A weekly commitment pinned to a particular weekday fires that many times in the month, which is the number a rota needs and not the one the calendar shows.
Toward the short end of the year
November sits among the shorter working months of 2026 under the Swiss federal calendar. A month reaches this end of the ranking either by being short or by absorbing closures, and the two produce the same headline number while behaving differently: a closure fragments the month, a shorter calendar does not.
2026 carries 255 working days in total under the Swiss federal calendar. The longest month of the year is July 2026 with 23 and the shortest is May 2026 with 19, a spread of 4. November ranks 9th of the twelve with 21.
Inside the year's longest clear run
November 2026 sits inside the longest stretch of 2026 with no Swiss federal closure in it. Where a month falls relative to its country's closure clusters changes what the same working-day count is worth: an uninterrupted month inside a long clear run behaves differently from one of equal length wedged between two closures.
Across 2026 the Swiss federal closures fall 1 in Q1, 4 in Q2, 0 in Q3, and 1 in Q4. A further two holidays land on the Saturday and Sunday weekend and cost no working day at all, which is why a country's holiday count and its working-day loss are different numbers.
The longest uninterrupted run in the 2026 calendar sits between May 25, 2026 and December 25, 2026, 214 calendar days with no Swiss federal closure in between. Stretches like that are where multi-week work belongs, and they move from year to year whenever a movable holiday does.
Where the month sits in the year's closure pattern
Closures are not spread evenly across a calendar year. They cluster around fixed anniversaries and around whichever lunar or movable feasts a jurisdiction observes, so two adjacent months can carry very different loads, and the Swiss federal calendar is no exception.
2026 opens its Swiss federal closures with Neujahrstag (New Year's Day) on January 1, 2026 and ends them with Weihnachten (Christmas Day) on December 25, 2026. The densest month of the year is April 2026 with two closures on working days.
One working day more than last year
There is one more working day in November 2026 than in November 2025: 21 against 20. A single-day swing is the ordinary case, produced by the calendar shifting forward one weekday between consecutive common years, and it is large enough to matter to a monthly target and small enough to be missed.
November opens 2025 on a Saturday, 2026 on a Sunday, and 2027 on a Monday. That movement, one weekday in a common year and two after a leap day, is what makes the three counts differ. The number of closures on working days is the same in both years, so the whole of any difference comes from weekday alignment. Looking ahead, November 2027 carries 22 working days.
Where the month's anchor dates fall
Two of the common monthly anchor dates in November 2026 land outside the working week or on a closure. The table below resolves each one against the Swiss federal calendar, together with the first working day on or after it.
| Date | Weekday | Status under the Swiss federal calendar | First working day on or after |
|---|---|---|---|
| November 1 | Sunday | Weekend | November 2, 2026 |
| November 5 | Thursday | Working day | November 5 |
| November 10 | Tuesday | Working day | November 10 |
| November 15 | Sunday | Weekend | November 16, 2026 |
| November 20 | Friday | Working day | November 20 |
| November 25 | Wednesday | Working day | November 25 |
| November 30 | Monday | Working day | November 30 |
The final column is arithmetic, not a legal conclusion. Whether an obligation actually moves when its date is not a working day depends on the instrument that sets it, and this site does not assume a shift rule for any jurisdiction. Where a rule is known it is stated in the holiday data methodology and on the country page it applies to.
Net terms dated in November 2026
An invoice dated the 1st of November on calendar-day Net 30 terms comes due on December 1, 2026, a working day under the Swiss federal calendar. Terms counted in calendar days move independently of the working week, so the same term written on two consecutive months can settle cleanly in one and roll across a closure in the other.
| Invoice date | Net 30, calendar days | Net 60, calendar days |
|---|---|---|
| Dated November 1 | December 1, 2026 | December 31, 2026 |
| Dated November 15 | December 15, 2026 | January 14, 2027 |
| Dated November 30 | December 30, 2026 | January 29, 2027 |
Net 30 and Net 60 are commercial conventions rather than statutory periods, and both are counted here in calendar days, which is how they are almost always written. Where a contract counts in working days instead, use the between-dates calculator with the Switzerland calendar selected, because the two produce different dates whenever a closure falls inside the term.
Sources and verification
Official source: Staatssekretariat für Wirtschaft SECO (seco.admin.ch) (opens in a new tab)
Cross-checked against this source on July 23, 2026.
For informational purposes only
This calculator provides general estimates based on business day counting rules. It does not constitute legal advice. Deadlines in legal, regulatory, or contractual matters may be subject to jurisdiction-specific rules, court orders, or statutory exceptions. Always verify critical deadlines with a qualified professional.
Frequently Asked Questions
How many business days are in November 2026 under the Swiss federal holiday calendar?
Which Switzerland holidays affect November 2026?
Why is the Swiss calendar federal only, not cantonal?
How does Switzerland handle weekend-falling holidays?
Why does the business-day count vary year to year?
When is the last working day of November 2026?
How many working days in a row does November 2026 offer?
Sources for these rules
- Der 1. August ist der einzige eidgenössische Feiertag; die Kantone dürfen höchstens acht weitere den Sonntagen gleichstellen (Art. 20a ArG) (Schweizerische Eidgenossenschaft (ch.ch))
- Gesetz über die öffentlichen Ruhetage (BR 520.100), Art. 2: die Feiertage Neujahr, Karfreitag, Ostermontag, Auffahrt, Pfingstmontag, Weihnachtstag und Stefanstag; Art. 3: die Gemeindebehörden können weitere konfessionelle Feiertage als lokale Ruhetage bezeichnen (Kanton Graubünden (Bündner Rechtsbuch))
- Zürich: kantonsweite Feiertage nach dem Recht des Kantons (zh.ch)
- Bern: kantonsweite Feiertage nach dem Recht des Kantons (belex.sites.be.ch)
- Vaud: kantonsweite Feiertage nach dem Recht des Kantons (prestations.vd.ch)
- Genève: kantonsweite Feiertage nach dem Recht des Kantons (ge.ch)
- St. Gallen: kantonsweite Feiertage nach dem Recht des Kantons (gesetzessammlung.sg.ch)
- Luzern: kantonsweite Feiertage nach dem Recht des Kantons (srl.lu.ch)
- Ticino: kantonsweite Feiertage nach dem Recht des Kantons (m3.ti.ch)
- Uri: kantonsweite Feiertage nach dem Recht des Kantons (rechtsbuch.ur.ch)
- Schwyz: kantonsweite Feiertage nach dem Recht des Kantons (sz.ch)
- Obwalden: kantonsweite Feiertage nach dem Recht des Kantons (gdb.ow.ch)
- Nidwalden: kantonsweite Feiertage nach dem Recht des Kantons (gesetze.nw.ch)
- Glarus: kantonsweite Feiertage nach dem Recht des Kantons (gesetze.gl.ch)
- Zug: kantonsweite Feiertage nach dem Recht des Kantons (bgs.zg.ch)
- Basel-Stadt: kantonsweite Feiertage nach dem Recht des Kantons (gesetzessammlung.bs.ch)
- Basel-Landschaft: kantonsweite Feiertage nach dem Recht des Kantons (bl.clex.ch)
- Schaffhausen: kantonsweite Feiertage nach dem Recht des Kantons (rechtsbuch.sh.ch)
- Appenzell Innerrhoden: kantonsweite Feiertage nach dem Recht des Kantons (ai.clex.ch)
- Thurgau: kantonsweite Feiertage nach dem Recht des Kantons (rechtsbuch.tg.ch)
- Valais: kantonsweite Feiertage nach dem Recht des Kantons (lex.vs.ch)
- Neuchâtel: kantonsweite Feiertage nach dem Recht des Kantons (ne.ch)
- Jura: kantonsweite Feiertage nach dem Recht des Kantons (jura.ch)
- Fribourg: kantonsweite Feiertage nach dem Recht des Kantons (bdlf.fr.ch)
- Solothurn: kantonsweite Feiertage nach dem Recht des Kantons (bgs.so.ch)
- Aargau: kantonsweite Feiertage nach dem Recht des Kantons (gesetzessammlungen.ag.ch)
- Appenzell Ausserrhoden: kantonsweite Feiertage nach dem Recht des Kantons (ar.clex.ch)
- Verordnung zum Arbeitsgesetz (bGS 822.11), Art. 7: der zweite Weihnachtstag wird nicht gefeiert, wenn der 1. Weihnachtstag auf einen Montag oder Freitag fällt (Kanton Appenzell Ausserrhoden (Gesetzessammlung))
- Art. 78 OR: fällt der Erfüllungstag oder der letzte Tag einer Frist auf einen Sonntag oder einen am Erfüllungsorte staatlich anerkannten Feiertag, gilt der nächstfolgende Werktag; Fussnote 40: für Fristen des Bundesrechts ist der Samstag einem anerkannten Feiertag gleichgestellt (SR 173.110.3) (Stand 1. Januar 2026) (Bundesversammlung der Schweizerischen Eidgenossenschaft (Fedlex))
Checked October 8, 2026. All sources